| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on a 150' north/south and 500' east/west setback from unit boundaries, with south setback based on a cemented production liner with a wet shoe. ๐ Page 1 of 10 Specific, non-standard wellbore placement constraints tied to a unique completion design (cemented liner with wet shoe) to manage boundary setbacks. |
Unknown | Directional Drilling |
| Tier 3 |
Well pad located on an aquifer triggering mandatory onsite inspection and specific containment requirements. ๐ Page 1 of 10 Imposes non-standard, site-specific stipulations like a closed mud system with no drilling pit and an impermeable liner for the entire location, increasing planning and compliance complexity. |
Unknown | Mud / Fluids |
| Tier 3 |
Operator must contact NDIC Field Inspector Marc Binns prior to location construction.โฐ TIME-SENSITIVE ๐ Page 2 of 10 Creates a mandatory, pre-construction regulatory checkpoint with a named individual, adding a sequential dependency to the schedule. |
Relative | General Oilfield Services |
| Tier 3 |
Operator plans to submit a sundry to waive open hole logs. ๐ Drilling Plan, Evaluation Program section Deviates from standard evaluation program, indicating a cost-saving or operational efficiency intent that must be approved by the NDIC. |
Unknown | General Oilfield Services |