| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Mandatory pre-construction contact with NDIC Field Inspector Marc Binns due to aquifer location.โฐ TIME-SENSITIVE ๐ Page 2 of 10 This is a non-routine, site-specific regulatory condition beyond standard permit approval, requiring direct operator-inspector coordination before any dirt work. |
2026-09-21 | General Oilfield Services |
| Tier 3 |
Operator acknowledges requirement for a leak-proof, covered, placarded container for filter socks on-site from spud through clean-out, completion, and flow-back. ๐ Page 9 of 10 This is a specific, ongoing waste management obligation attached to the well's entire completion phase, not a one-time event. |
2026-09-21 | General Oilfield Services |
| Tier 3 |
KLX Directional is pre-designated as the MWD Contractor. ๐ Drilling Plan - Estimated Formation Tops The vendor is explicitly named in the operator's drilling plan, indicating a contracted or intended service relationship. |
2026-07-29 | Directional Drilling |
| Tier 3 |
Operator plans to submit a sundry to waive open hole logs, relying on MWD and cased-hole evaluation. ๐ Drilling Plan - Evaluation Program Waiving open-hole logs is a non-routine operational decision that alters the standard data acquisition profile. |
Unknown | General Oilfield Services |