๐Ÿ›ข๏ธ ALE 2436-6BH

KODA RESOURCES OPERATING, LLC ยท Divide County, ND ยท File #43323 ยท Generated 2026-09-28 03:16

API
3302301881
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Mandatory pre-construction contact with NDIC Field Inspector Marc Binns due to aquifer location.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10
This is a non-routine, site-specific regulatory condition beyond standard permit approval, requiring direct operator-inspector coordination before any dirt work.
2026-09-21 General Oilfield Services
Tier 3 Operator acknowledges requirement for a leak-proof, covered, placarded container for filter socks on-site from spud through clean-out, completion, and flow-back.
๐Ÿ“„ Page 9 of 10
This is a specific, ongoing waste management obligation attached to the well's entire completion phase, not a one-time event.
2026-09-21 General Oilfield Services
Tier 3 KLX Directional is pre-designated as the MWD Contractor.
๐Ÿ“„ Drilling Plan - Estimated Formation Tops
The vendor is explicitly named in the operator's drilling plan, indicating a contracted or intended service relationship.
2026-07-29 Directional Drilling
Tier 3 Operator plans to submit a sundry to waive open hole logs, relying on MWD and cased-hole evaluation.
๐Ÿ“„ Drilling Plan - Evaluation Program
Waiving open-hole logs is a non-routine operational decision that alters the standard data acquisition profile.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental & Waste Management
The aquifer location triggers strict containment rules (closed mud system, impermeable liner) and the filter-sock container rule is in effect from spud through flowback, requiring specialized equipment and hauling to facilities like the named '13 Mile Landfill'.
Directional Drilling / MWD
KLX Directional is explicitly named as the MWD contractor in the drilling plan dated July 29, 2026, indicating an imminent service engagement for the planned ~15,500 ft lateral.
Cementing & Wellbore Isolation
The permit condition requires cementing a production liner in the lateral with a 'wet shoe' to facilitate fracturing out the toe, indicating a specific cementing design need for the completion.
Surveying & Pad Design
Uintah Engineering and Land Surveying prepared the as-built pad layout and containment calculations following a March 2026 drone survey, showing recent and likely ongoing involvement in pad development.