๐Ÿ›ข๏ธ MAVERICK 31-6-7-18 1H

Phoenix Operating LLC ยท Divide County, ND ยท File #43325 ยท Generated 2026-09-24 04:56

API
3302301883
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Completion design specifies a 'wet shoe with ability to frac out the toe' and includes a backup 'Hyd Toe Sleeve'.
๐Ÿ“„ Proposed Drilling Plan, Schematic Notes
The explicit design for a frac-able wet shoe and backup sleeve is a specific engineering choice impacting completion tool and cementing services.
2026-09-08 Completions / Frac
Tier 3 Mandatory pre-construction contact with a specific NDIC Field Inspector (Marc Binns) is required.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations, Page 1
A stipulation requiring direct contact with a named inspector before location construction is a specific, non-routine regulatory hurdle with timing implications.
2026-09-22 General Oilfield Services
Tier 3 Operator has pre-selected and named a specific licensed disposal facility for drill cuttings: Smoky Butte Environmental LLC.โฐ TIME-SENSITIVE
๐Ÿ“„ Proposed Drilling Plan, Section 4
Naming a specific disposal vendor in the permit is non-routine and indicates a locked-in service contract for waste hauling and disposal ahead of spud.
2026-09-08 General Oilfield Services
Tier 3 Permit includes detailed pad layout for 9 wells (4 MAVERICK, 4 TOP GUN, 1 SWD) with ~22 acres of disturbance and ~98,550 cu yds of earthwork.
๐Ÿ“„ Pad Layout and Engineering Drawings
The scale of earthwork and multi-well pad construction is a significant, non-routine capital project requiring specialized civil and site prep contractors.
2026-08-27 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Waste Hauling & Disposal
Permit explicitly names Smoky Butte Environmental LLC as the disposal facility, indicating a contracted service opportunity commencing with drilling.
Earthwork & Pad Construction
Large-scale pad construction with detailed cut/fill quantities (~98,550 cu yds) and road building is required before drilling can begin, as shown on the 08-27-2026 revised plat.
Directional Drilling & MWD Services
Complex well paths requiring a regulatory waiver for 'backbuild' trajectories into the spacing unit indicate precise drilling and survey needs for the upcoming multi-well program.
Completion Tools & Cementing
The specified 'wet shoe' and 'Hyd Toe Sleeve' completion design creates a specific need for specialized liner hanger, cementing, and stimulation tool services.