| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Operator is coordinating a multi-well pad (Maverick and Top Gun wells) and has filed for a waiver to the 'backbuild order' notification requirements.โฐ TIME-SENSITIVE ๐ Letter from Meaghan Coughlan dated September 9th, 2026 The letter demonstrates proactive regulatory engagement for a multi-well development plan, indicating advanced stage planning and imminent activity. |
2026-09-09 | Regulatory / Permitting |
| Tier 3 |
Completion design specifies use of a 'wet shoe with ability to frac out the toe'. ๐ Permit Stipulations / Conditions of Approval and Proposed Work / Stimulation section This is a specific completion technique choice detailed in the permit, differing from a standard plug-and-perf design. |
Unknown | Completions / Frac |
| Tier 3 |
NDIC Field Inspector Marc Binns must be contacted prior to location construction. ๐ Permit Stipulations / Conditions of Approval The condition names a specific inspector and creates a mandatory pre-construction checkpoint not required for all permits. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator has pre-selected Smoky Butte Environmental LLC for drill cuttings disposal. ๐ Proposed Work / Disposal of Drill Cuttings section Vendor is explicitly named in the permit's proposed work plan, indicating a locked-in service contract rather than an open bid. |
Unknown | General Oilfield Services |