โ† Back to Daily Permits

๐Ÿ›ข๏ธ Huron State 14-36 36 25 TF1H

True Oil LLC ยท McKenzie County, ND ยท File #43343 ยท Generated 2026-09-30 06:49

API
3305310893
Target Formation
Three Forks Upper
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Mandatory core and sample submission to state library with strict deadlines and penalty threatโฐ TIME-SENSITIVE
๐Ÿ“„ Letter from Tamara Madche, Mark F. Bohrer, Nathan D. Anderson, Clint A. Boyd
Regulatory directive imposes specific collection intervals (Base of Last Charles Salt), packaging standards, and 30-day (samples) / 180-day (cores) deadlines post-drilling, with civil penalty up to $12,500 per offense per day.
2026-09-28 General Oilfield Services
Tier 3 Federal minerals notification required; operator directed to contact BLM Dickinson officeโฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele to Sergio Villa
Permitting engineer flags that the spacing unit 'may be subject to a Federal permit' and instructs operator to contact BLM to ensure proper filing.
2026-09-25 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Will Ryan prior to location constructionโฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations
Pre-construction notification requirement to a specific inspector (Will Ryan, 701-770-6684) is a non-routine condition of approval.
2026-09-25 General Oilfield Services
Tier 3 Permit requires well to be drilled in conjunction with another well to justify spacing unit
๐Ÿ“„ Permit Stipulations
Approval is conditional on this well being 'drilled in conjunction with a well that meets a 1220' setback from the east and west spacing unit boundaries'.
2026-09-25 Drilling Rigs
Tier 3 Drill cuttings disposal pre-committed to two specific facilities
๐Ÿ“„ Letter from Sergio Villa to Daniel Kuchar
Operator explicitly states cuttings will be taken only to 'Ideal Oilfield Disposal or IHD Solid Management disposal facility'.
2025-11-10 General Oilfield Services
Tier 3 H2S safety plan prepared by Total Safety Inc., with extensive equipment and training requirements
๐Ÿ“„ H2S Drilling Operations Plan
Detailed, vendor-specific safety plan mandates H2S monitoring, breathing apparatus, trailers, and weekly drills, indicating planned H2S risk.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental & Waste Disposal
Operator has pre-committed to two specific disposal facilities for cuttings (Ideal Oilfield Disposal or IHD Solid Management). Waste hauling and disposal services are locked in.
H2S Safety & Monitoring
A comprehensive, vendor-specific H2S plan is in place, requiring continuous monitoring, equipment maintenance, and weekly drills. Ongoing service opportunity from spud through completion.
Core & Sample Management
Regulatory letter imposes strict 30-day (samples) and 180-day (cores) deadlines post-drilling completion for submission to the state library, creating immediate post-drilling logistics and packaging service need.
Civil Construction & Surveying
Pad design and surveying are complete (by Highlands Engineering). Construction must be preceded by a call to Inspector Will Ryan, indicating imminent site construction activity.