| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval condition includes a 150' north setback based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe. ๐ Permit stipulations Specific completion design (cemented liner with wet shoe) is tied to a regulatory setback condition, indicating a non-standard wellbore construction plan to meet spacing rules. |
Unknown | Completions / Frac |
| Tier 3 |
Affidavit confirms a Surface Use Agreement is in place with landowners for off-spacing operations, dated effective March 1, 2026. ๐ Drilling Permit Affidavit Securing surface access for off-spacing wells is a critical pre-drilling milestone; the affidavit provides proof and a specific execution date. |
2026-03-01 | General Oilfield Services |
| Tier 3 |
Affidavit from Hess Senior Manager states Halliburton Energy Services is the stimulation treatment supplier and does not use diesel fuels in fracturing. ๐ Hydraulic Fracturing Stimulation affidavit Identifies Halliburton as the pre-selected frac vendor via a historical affidavit, establishing a long-standing vendor relationship for completions. |
2022-04-21 | Completions / Frac |
| Tier 3 |
Operator must contact NDIC Field Inspector Robert Stafford prior to location construction. ๐ Conditions of Approval Pre-construction contact with a specific inspector is a mandated step, creating a defined regulatory checkpoint before pad work begins. |
Relative | General Oilfield Services |
| Tier 3 |
Integrated well pad design for six wells includes detailed civil engineering, stormwater management, and interim reclamation plans. ๐ Civil layout and plan notes The document contains extensive, engineered pad construction details far beyond a typical permit, indicating a major, planned multi-well pad development. |
Unknown | General Oilfield Services |