โ† Back to Daily Permits

๐Ÿ›ข๏ธ GO-Beyer-158-98-3415H-2

HESS BAKKEN INVESTMENTS II, LLC ยท Williams County, ND ยท File #43348 ยท Generated 2026-10-01 04:22

API
3310506898
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Conditional permit approval based on a cemented production liner with a wet shoe to manage north setback.
๐Ÿ“„ Page 1, Stipulations section.
The approval is contingent on a specific, non-standard completion design (cemented liner with wet shoe) to meet spacing unit setback requirements.
Unknown Completions / Frac
Tier 3 Pre-notification provided to offset operator (Kraken Operating, LLC) for wellbore traversing their unit.
๐Ÿ“„ Drilling Permit Affidavit, pages following well file content.
Demonstrates proactive regulatory compliance and inter-operator coordination for a well that will enter an adjacent operator's spacing unit.
2026-07-13 General Oilfield Services
Tier 3 Pre-selected directional planning vendor (Scientific Drilling) used for well plan.
๐Ÿ“„ Directional plan pages and planning report.
Vendor is explicitly named in the directional plan and report, indicating a pre-awarded service contract for well planning and potentially execution.
2026-07-07 Directional Drilling
Tier 3 Off-spacing well requiring a surface use agreement affidavit for drilling into adjacent units.
๐Ÿ“„ Affidavit section, pages following well file content.
Indicates a non-standard location requiring negotiated surface access, revealing operational complexity and potential for surface owner engagement.
2026-06-17 General Oilfield Services
Tier 3 Integrated multi-well pad with central test and group facility planned.
๐Ÿ“„ Facility plot plan and civil layout drawings within well file.
The well is part of a 9-well pad with shared emulsion skids, electrical infrastructure, and a central facility, indicating a large-scale, capital-intensive development.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
Detailed engineered pad plans are complete and issued for construction; major earthmoving, surfacing, and drainage work is imminent for the multi-well pad.
Directional Drilling & MWD/LWD
A detailed directional plan from a specific vendor exists; drilling is pending, requiring execution of the planned trajectory with precise surveying and geosteering.
Cementing & Completion Tools
The permit is conditional on using a cemented production liner with a wet shoe, defining a specific cementing and liner hanger scope for the lateral section.
Flowline & Facility Construction
Integrated facility plot plans show extensive flowline estimates and central facility skids, indicating construction will follow pad preparation and drilling.