๐Ÿ›ข๏ธ GO-Beyer- 158-98-3415H-3

HESS BAKKEN INVESTMENTS II, LLC ยท Williams County, ND ยท File #43349 ยท Generated 2026-10-02 18:58

API
3310506899
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Use of a cemented production liner with a wet shoe designed to be fracked out
๐Ÿ“„ Permit stipulations and completion equipment notes
The north setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe. This is a specific completion design choice for wellbore isolation and subsequent stimulation access.
Unknown Completions / Frac
Tier 3 Off-spacing well requiring surface use agreement affidavit for drilling into adjacent units
๐Ÿ“„ Affidavit section
Well is designed to enter the Bakken formation outside its target spacing unit, traversing sections operated by another company (Kraken Operating, LLC). This requires a formal surface use agreement and notification, indicating complex land and unit coordination.
2026-06-17 General Oilfield Services
Tier 3 Pre-selected stimulation treatment supplier Halliburton Energy Services via affidavit
๐Ÿ“„ Hydraulic Fracturing Stimulation affidavit
A 2022 affidavit from Hess Senior Manager confirms Halliburton Energy Services as the stimulation treatment supplier that does not use specified diesel fuels. This indicates a pre-existing, company-wide vendor relationship for completions.
2022-04-21 Completions / Frac
Tier 3 Mandatory pre-construction contact with NDIC Field Inspector Robert Staffordโฐ TIME-SENSITIVE
๐Ÿ“„ Permit stipulations
Specific inspector named (Robert Stafford) and contact number provided. Operator must contact him prior to location construction, indicating heightened regulatory oversight or site-specific conditions.
Relative General Oilfield Services
Tier 3 Anti-collision protocols requiring real-time surveys and geo-steering around existing wellbores
๐Ÿ“„ Proposed work section
Operator outlines detailed anti-collision standards including 1.5 separation factor, real-time corrected surveys, and use of gamma ray to geo-steer around existing wells. Indicates a densely drilled area with high risk of wellbore interference.
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Land & Surface Negotiation
The off-spacing affidavit and surface use agreement were executed in March and June 2026, immediately prior to the permit approval. This indicates recent, time-sensitive activity to clear legal hurdles for drilling.
Directional Drilling & Surveying
The detailed anti-collision plan and long lateral targeting off-spacing units create an immediate need for high-precision directional drilling, real-time survey, and geo-steering services as drilling is imminent.
Regulatory & Inspection Coordination
The mandatory pre-construction contact with a specific NDIC field inspector (Robert Stafford) is a gate that must be passed before pad construction begins, requiring coordination.
Civil Construction & Earthwork
Detailed engineered pad design plans exist (dated 2026), and the permit requires contact with the inspector prior to location construction. This signals that pad construction is the next immediate physical activity.