| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Conditional permit approval based on a production liner with a wet shoe to frac out the shoe for north setback ๐ Page 1, STIPULATIONS The permit is conditionally granted on a specific, non-routine completion design (cemented liner with wet shoe) to meet a 150-foot setback. |
Unknown | Completions / Frac |
| Tier 3 |
Off-spacing affidavit filed for lateral entry into adjacent unit operated by Kraken Operating, LLC ๐ Drilling Permit Affidavit Indicates a non-standard lateral crossing into a unit operated by a different company, requiring formal notification and coordination. |
2026-07-13 | General Oilfield Services |
| Tier 3 |
Surface Use Agreement affidavit for off-spacing wells executed with specific landowners ๐ Affidavit Explicitly secures surface rights for drilling wells into off-spacing units, a prerequisite for the planned multi-well pad. |
2026-06-17 | Drilling Rigs |
| Tier 3 |
Affidavit confirms Halliburton Energy Services as the pre-selected stimulation supplier and verifies no diesel fuels in HF ๐ Letter dated April 21, 2022 Historically names a primary frac vendor and documents compliance with a specific regulatory memo, indicating a locked-in vendor relationship. |
2022-04-21 | Completions / Frac |
| Tier 3 |
Pre-construction contact required with NDIC Field Inspector Robert Staffordโฐ TIME-SENSITIVE ๐ Page 1, Conditions of Approval Mandatory regulatory checkpoint before location construction begins, adding a procedural step. |
Relative | General Oilfield Services |