| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval condition specifies a 'production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe'. ๐ Permit Stipulations, Page 1 This is a specific engineering design mandated by the regulator as a condition of approval, dictating the completion method. |
2026-09-28 | Completions / Frac |
| Tier 3 |
Surface Use Agreement explicitly grants rights for drilling 'off lease' (off spacing) wells into nine specified sections from this pad location. ๐ Affidavit of Jennings White The agreement is not just for the permitted well but for future wells targeting units where the operator may not hold the mineral rights, indicating strategic pad placement for extended development. |
2026-06-17 | Drilling Rigs |
| Tier 3 |
Historical affidavit (2022) names Halliburton Energy Services as the sole stimulation treatment supplier verified for Hess's Bakken operations. ๐ Hydraulic Fracturing Stimulation Affidavit While dated, it explicitly names Halliburton as the supplier and states the affidavit 'covers all wells to be drilled and stimulated', indicating a longstanding, programmatic relationship. |
2022-04-21 | General Oilfield Services |
| Tier 3 |
Mandatory pre-construction contact with NDIC Field Inspector Robert Stafford.โฐ TIME-SENSITIVE ๐ Permit Stipulations, Page 1 Construction cannot commence until this direct, personal contact is made, adding a regulatory step beyond standard permit approval. |
Relative | General Oilfield Services |