โ† Back to Daily Permits

๐Ÿ›ข๏ธ HOBBIT 30-31-6-7 1H-LL

Phoenix Operating LLC ยท Divide County, ND ยท File #43352 ยท Generated 2026-10-02 04:40

API
3302301893
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 South setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
๐Ÿ“„ Page 1
Reveals a specific completion design choice (wet shoe) to enable fracturing out of the toe, which influences liner cementing and stimulation plans.
Unknown Completions / Frac
Tier 3 Affidavit states operator notified Continental of drilling and completion plans for wellbores entering Bakken system outside target spacing unit per Order 31848.
๐Ÿ“„ Aerial Map / Affidavit section
Demonstrates active regulatory compliance and inter-operator coordination for extended-reach laterals crossing unit boundaries.
2026-06-16 General Oilfield Services
Tier 3 Approval conditional on wellbore being located down north-south axis within 500' corridor and no closer than 150' setback from north & south boundaries of the 5120-acre spacing unit.
๐Ÿ“„ Page 1
Imposes specific directional and positional constraints on the lateral, deviating from standard setback rules, likely to manage unit drainage and well spacing.
Unknown Directional Drilling
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2
Specifies a pre-construction regulatory checkpoint with a named inspector, adding a step before pad build.
Relative General Oilfield Services
Tier 3 Drill cuttings disposal contracted to Smoky Butte Environmental LLC.
๐Ÿ“„ Proposed Work section
Explicitly names a waste disposal vendor and location, indicating a pre-selected contractor for this service.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD
The well has strict directional constraints (500' corridor, 150' setbacks) and a long lateral crossing county lines, requiring high-precision steering and survey services.
Liner Hanger & Cementing
The completion plan specifies a production liner with a wet shoe sub, requiring specialized liner running and cementing services to enable the frac-out design.
Waste Hauling / Disposal
The operator has explicitly named Smoky Butte Environmental as the cuttings disposal vendor, indicating an immediate, locked-in service need upon spud.