๐Ÿ›ข๏ธ TOP GUN 30-19-18-7 3HF

Phoenix Operating LLC ยท Divide County, ND ยท File #43356 ยท Generated 2026-10-07 05:14

API
3302301897
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (3)

Tier Signal Date Service Impact
Tier 3 NDIC Permitting Engineer flagged that the permit's spacing unit may be subject to a Federal (BLM) permit, instructing the operator to contact the BLM Dickinson office.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele dated September 22, 2026
Introduces a potential federal permitting overlay not evident from the state permit alone, adding a layer of regulatory complexity and a required action for the operator.
2026-09-22 General Oilfield Services
Tier 3 Operator proactively sought and justified a waiver from NDIC Order 31848 for eight wells to enter the Bakken formation outside their target spacing units from a common pad.โฐ TIME-SENSITIVE
๐Ÿ“„ Letter from Meaghan Coughlan dated September 9th, 2026
The waiver request is a specific regulatory hurdle cleared prior to operations, confirming pad-scale development intent and revealing a planned operational pattern that deviates from standard spacing.
2026-09-09 Regulatory / Permitting
Tier 3 Operator pre-selected a licensed disposal facility for all drill cuttings: Smoky Butte Environmental LLC.
๐Ÿ“„ Proposed Work - Disposal of Drill Cuttings section
The vendor is explicitly named in the approved drilling plan, indicating a contracted service rather than a routine, post-spud selection.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Completions Engineering
The approved plan details a specific wet shoe completion design and a complex cementing program for a long lateral, indicating need for precise execution services.
Waste Hauling & Disposal
A specific disposal contractor (Smoky Butte Environmental LLC) is named in the permit, indicating this service is already secured for the imminent drilling operation.
Surveying & Pad Construction
Detailed pad layout and earthwork plans from Uintah Engineering are included, suggesting recent or ongoing site preparation work for the multi-well pad.