| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit approval conditional on a 150' north/south and 500' east/west setback within the 2560-acre unit, with north setback based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe. ๐ Permit Information / Stipulations Imposes specific, non-standard geometric constraints on wellbore placement and completion design, requiring precise engineering. |
Unknown | Directional Drilling |
| Tier 3 |
Surface damage affidavit confirms a multi-well pad with wells drilled off-spacing from a surface location in Section 31. ๐ Affidavit of Surface Damage Agreement dated September 24, 2026 Formalizes a surface agreement covering multiple wells, including some drilled from a surface location outside their target spacing unit. |
2026-09-24 | General Oilfield Services |
| Tier 3 |
NDIC engineer flagged permit for potential federal minerals, instructing operator to contact BLM Dickinson office.โฐ TIME-SENSITIVE ๐ Email from Nathaniel Erbele dated September 22, 2026 Identifies a late-stage, post-submission regulatory hurdle involving federal minerals and inter-agency coordination. |
2026-09-22 | General Oilfield Services |
| Tier 3 |
Operator filed a waiver request for backbuild order notification, citing majority working interest ownership in adjacent sections as justification. ๐ Letter from Phoenix Energy dated September 9th, 2026 Demonstrates proactive regulatory strategy to circumvent standard neighbor notification by leveraging ownership data. |
2026-09-09 | Regulatory / Permitting |
| Tier 3 |
Operator must contact NDIC Field Inspector Marc Binns prior to location construction.โฐ TIME-SENSITIVE ๐ Conditions of Approval Specifies a named inspector and a mandatory pre-construction contact, adding a regulatory step before pad work begins. |
Relative | General Oilfield Services |