๐Ÿ›ข๏ธ TOP GUN 30-19-18-7 4HF

Phoenix Operating LLC ยท Divide County, ND ยท File #43357 ยท Generated 2026-10-02 04:44

API
3302301898
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Permit approval conditional on a 150' north/south and 500' east/west setback within the 2560-acre unit, with north setback based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe.
๐Ÿ“„ Permit Information / Stipulations
Imposes specific, non-standard geometric constraints on wellbore placement and completion design, requiring precise engineering.
Unknown Directional Drilling
Tier 3 Surface damage affidavit confirms a multi-well pad with wells drilled off-spacing from a surface location in Section 31.
๐Ÿ“„ Affidavit of Surface Damage Agreement dated September 24, 2026
Formalizes a surface agreement covering multiple wells, including some drilled from a surface location outside their target spacing unit.
2026-09-24 General Oilfield Services
Tier 3 NDIC engineer flagged permit for potential federal minerals, instructing operator to contact BLM Dickinson office.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele dated September 22, 2026
Identifies a late-stage, post-submission regulatory hurdle involving federal minerals and inter-agency coordination.
2026-09-22 General Oilfield Services
Tier 3 Operator filed a waiver request for backbuild order notification, citing majority working interest ownership in adjacent sections as justification.
๐Ÿ“„ Letter from Phoenix Energy dated September 9th, 2026
Demonstrates proactive regulatory strategy to circumvent standard neighbor notification by leveraging ownership data.
2026-09-09 Regulatory / Permitting
Tier 3 Operator must contact NDIC Field Inspector Marc Binns prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval
Specifies a named inspector and a mandatory pre-construction contact, adding a regulatory step before pad work begins.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Wellbore Placement
The conditional permit with specific geometric setbacks and the off-spacing surface location require precise wellbore trajectory planning and execution.
Cementing & Liner Services
The approved plan mandates a cemented production liner with a wet shoe designed to be fractured, indicating a need for specialized liner hanger, cementing, and shoe track services.
Regulatory & Land Services (BLM/Federal Minerals)
The NDIC's flag for potential federal minerals creates an immediate need for expertise in BLM permitting and mineral ownership verification to avoid spud delays.
Pad Construction & Earthwork
The detailed pad layout with extensive cut/fill calculations and a pre-construction inspector notification signal imminent site preparation work.
Waste Hauling & Disposal
The explicit naming of Smoky Butte Environmental as the cuttings disposal facility indicates a contracted service opportunity for hauling from this pad.