โ† Back to Daily Permits

๐Ÿ›ข๏ธ ROOSTER 29-20-17-8 4HF

Phoenix Operating LLC ยท Divide County, ND ยท File #43358 ยท Generated 2026-10-02 19:03

API
3302301899
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Permit includes a specific condition for a wet shoe in the production liner to enable fracking out the shoe, tied to a reduced north setback.
๐Ÿ“„ Permit Review Policy / Conditions of Approval
This is a non-standard engineering condition modifying standard setbacks, indicating a tailored wellbore design to maximize lateral length within the unit.
Unknown Completions / Frac
Tier 3 NDIC engineer flagged potential Federal (BLM) permit requirement due to spacing unit composition.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele dated 9/22/2026
Identifies an additional, non-NDIC regulatory layer (BLM) that the operator must address, adding complexity and potential delay.
2026-09-22 General Oilfield Services
Tier 3 Operator filed a waiver request for backbuild order notification citing majority working interest ownership in adjacent unit.
๐Ÿ“„ Letter: ROOSTER 29-20-17-8 4HF - Backbuild Order Waiver
Demonstrates proactive regulatory strategy to streamline operations by leveraging ownership structure to avoid formal notifications.
2026-09-09 Regulatory / Permitting
Tier 3 Operator must contact NDIC Field Inspector Marc Binns prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Review Policy / Conditions of Approval
Pre-construction contact with a specific inspector is a stipulated condition, creating a defined regulatory checkpoint before work begins.
Relative General Oilfield Services
Tier 3 Drill cuttings disposal pre-selected to Smoky Butte Environmental LLC.
๐Ÿ“„ PROPOSED DRILLING PLAN - DISPOSAL OF DRILL CUTTINGS
The waste disposal vendor is explicitly named in the drilling plan, indicating a locked-in service contract.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling Waste Management
Vendor Smoky Butte Environmental is explicitly contracted for cuttings disposal; service is required upon commencement of drilling.
Civil Construction & Earthwork
Detailed pad layout, earthwork quantities (98,550 Cu. Yds. cut), and access road plans are finalized, indicating imminent site construction activity.
Regulatory & Land Coordination
The need to contact BLM per NDIC email and the pre-construction check with Inspector Marc Binns create immediate, time-sensitive coordination tasks.