| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit includes a specific condition for a wet shoe in the production liner to enable fracking out the shoe, tied to a reduced north setback. ๐ Permit Review Policy / Conditions of Approval This is a non-standard engineering condition modifying standard setbacks, indicating a tailored wellbore design to maximize lateral length within the unit. |
Unknown | Completions / Frac |
| Tier 3 |
NDIC engineer flagged potential Federal (BLM) permit requirement due to spacing unit composition.โฐ TIME-SENSITIVE ๐ Email from Nathaniel Erbele dated 9/22/2026 Identifies an additional, non-NDIC regulatory layer (BLM) that the operator must address, adding complexity and potential delay. |
2026-09-22 | General Oilfield Services |
| Tier 3 |
Operator filed a waiver request for backbuild order notification citing majority working interest ownership in adjacent unit. ๐ Letter: ROOSTER 29-20-17-8 4HF - Backbuild Order Waiver Demonstrates proactive regulatory strategy to streamline operations by leveraging ownership structure to avoid formal notifications. |
2026-09-09 | Regulatory / Permitting |
| Tier 3 |
Operator must contact NDIC Field Inspector Marc Binns prior to location construction.โฐ TIME-SENSITIVE ๐ Permit Review Policy / Conditions of Approval Pre-construction contact with a specific inspector is a stipulated condition, creating a defined regulatory checkpoint before work begins. |
Relative | General Oilfield Services |
| Tier 3 |
Drill cuttings disposal pre-selected to Smoky Butte Environmental LLC. ๐ PROPOSED DRILLING PLAN - DISPOSAL OF DRILL CUTTINGS The waste disposal vendor is explicitly named in the drilling plan, indicating a locked-in service contract. |
Unknown | General Oilfield Services |