๐Ÿ›ข๏ธ SHORT PRAIRIE 2

DEVON ENERGY WILLISTON, L.L.C. ยท Williams County, ND ยท File #43368 ยท Generated 2026-10-06 04:04

API
3310506908
Target Formation
Dakota
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Permit includes a tank diking variance request approved contingent on submission of an as-built schematic.
๐Ÿ“„ Permit Information / Stipulations / UIC Stipulation
Indicates a non-standard facility design requiring post-construction verification, creating a specific deliverable and potential follow-up work.
2026-10-02 General Oilfield Services
Tier 3 Extensive freshwater well sampling and analysis completed for three wells within 1-mile AOR as part of permit application.
๐Ÿ“„ Exhibit B โ€” Freshwater Wells within 1-Mile AOR
Demonstrates proactive environmental due diligence and establishes a baseline, potentially indicating a template for future SWD applications in the area.
2026-06-29 General Oilfield Services
Tier 3 Permit requires a high-pressure injection pipeline pressure test to 100 psi over permitted max and detailed reporting via Sundry Form.
๐Ÿ“„ Permit Information / Stipulations / UIC Stipulation
A specific, non-routine pressure test exceeding operational limits is mandated prior to injection, requiring specialized testing services.
Relative General Oilfield Services
Tier 3 Spill prevention controls require SCADA integration, high-level alarms/shutdowns, and lined containment with specific volume calculations.
๐Ÿ“„ Spill Prevention and Monitoring Controls
Specifies an advanced, automated control system beyond basic containment, indicating investment in high-integrity environmental safeguards.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Pressure Testing & Pipeline Inspection
Mandatory 100-psi-over-max pressure test on the injection pipeline must be performed and reported prior to first injection, creating an immediate pre-operation service window.
Surveying & As-Built Drafting
A tank diking variance is approved contingent on submitting an as-built site schematic after construction, creating a time-sensitive deliverable linked to permit compliance.
Environmental Sampling & Analysis
The successful permitting process, which included extensive freshwater well sampling, establishes a model that may be repeated for future SWD wells, indicating sustained demand.