| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Operator plans to use a 'wet shoe' liner configuration, intentionally leaving ~400 ft of uncemented annulus at the toe to enable pump-down wireline perforating for the first stage. ๐ Engineering section within the permit, detailed in '1.11 Wet Shoe' and Fig. 1.1. This is a specific engineering design choice to reduce completion costs compared to tubing-conveyed or tractor perforating. It dictates the cementing and initial completion methodology. |
Unknown | Completions / Frac |
| Tier 3 |
Operator has requested a waiver for open-hole logs, planning only a cased-hole Cement Bond Log. The waiver is noted as requiring a separate sundry filing. ๐ Engineering section '1.7 Evaluation Program'. Requesting a log waiver is a non-routine regulatory and operational choice that reduces service scope for open-hole logging contractors but may necessitate a separate regulatory filing. |
Relative | Regulatory / Permitting |
| Tier 3 |
Mandatory pre-construction contact with a named NDIC Field Inspector (Nicole Ewoniuk) is required due to the well pad being located on an aquifer.โฐ TIME-SENSITIVE ๐ Permit Stipulations, Page 2. This is a site-specific, non-routine stipulation that adds a regulatory compliance step before any ground disturbance. It creates a defined point of contact and potential for additional site-specific requirements. |
Relative | General Oilfield Services |
| Tier 3 |
Operator has declared a list of eight specific licensed facilities for dry drill cuttings disposal, noting cuttings will be hauled to the closest available. ๐ Engineering section 'LICENSED FACILITIES FOR SOLID DRILL CUTTINGS DISPOSAL'. This is a declared vendor shortlist for waste disposal, indicating pre-qualified contractors and influencing logistics planning for drilling waste. |
Unknown | General Oilfield Services |