| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe completion design for toe initiation to enable cheaper wireline pump-down perforation. ๐ Page 10, Section 1.11 Wet Shoe Deliberate engineering choice to reduce completion cost by avoiding tubing/tractor perforation, indicating a focus on operational efficiency. |
Unknown | Completions / Frac |
| Tier 3 |
Anticipated drilling commencement date is June 7, 2025, with approximately 30 drilling days.โฐ TIME-SENSITIVE ๐ Page - Section 1.8 Anticipated Starting Dates Provides a specific planned start date far in advance, indicating project scheduling and readiness. |
2025-06-07 | Drilling Rigs |
| Tier 3 |
Aquifer location triggers mandatory onsite inspection and closed mud system with impermeable liner. ๐ Page 1, STIPULATIONS **SPECIAL ATTENTION** Imposes non-standard, site-specific environmental and operational constraints that require NDIC inspector approval and specialized containment. |
Unknown | Mud / Fluids |
| Tier 3 |
Waiver requested for open-hole logs; only a cased-hole cement bond log planned. ๐ Page 7, Section 1.7 Evaluation Program Operator is forgoing standard open-hole logging, reducing wireline/logging scope, which requires regulatory approval. |
Unknown | Regulatory / Permitting |
| Tier 3 |
Operator must contact NDIC Field Inspector Nicole Ewoniuk prior to location construction. ๐ Page 2, Construction Commencement Notification Mandatory pre-construction contact with a named inspector adds a regulatory step and potential for site-specific stipulations. |
Relative | General Oilfield Services |