โ† Back to Daily Permits

๐Ÿ›ข๏ธ Potter 4595 33-29 4B

OASIS PETROLEUM NORTH AMERICA LLC ยท Dunn County, ND ยท File #43370 ยท Generated 2026-10-08 04:32

API
3302505247
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe completion design for toe initiation to enable cheaper wireline pump-down perforation.
๐Ÿ“„ Page 10, Section 1.11 Wet Shoe
Deliberate engineering choice to reduce completion cost by avoiding tubing/tractor perforation, indicating a focus on operational efficiency.
Unknown Completions / Frac
Tier 3 Anticipated drilling commencement date is June 7, 2025, with approximately 30 drilling days.โฐ TIME-SENSITIVE
๐Ÿ“„ Page - Section 1.8 Anticipated Starting Dates
Provides a specific planned start date far in advance, indicating project scheduling and readiness.
2025-06-07 Drilling Rigs
Tier 3 Aquifer location triggers mandatory onsite inspection and closed mud system with impermeable liner.
๐Ÿ“„ Page 1, STIPULATIONS **SPECIAL ATTENTION**
Imposes non-standard, site-specific environmental and operational constraints that require NDIC inspector approval and specialized containment.
Unknown Mud / Fluids
Tier 3 Waiver requested for open-hole logs; only a cased-hole cement bond log planned.
๐Ÿ“„ Page 7, Section 1.7 Evaluation Program
Operator is forgoing standard open-hole logging, reducing wireline/logging scope, which requires regulatory approval.
Unknown Regulatory / Permitting
Tier 3 Operator must contact NDIC Field Inspector Nicole Ewoniuk prior to location construction.
๐Ÿ“„ Page 2, Construction Commencement Notification
Mandatory pre-construction contact with a named inspector adds a regulatory step and potential for site-specific stipulations.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental & Containment
Aquifer location mandate requires immediate NDIC inspector coordination, closed mud system, and impermeable liner installation before construction.
Drilling & Rig Services
Anticipated spud date of June 7, 2025, with ~30 drilling days provides a clear timeline for rig and drilling fluid contractor mobilization.
Waste Disposal
Operator Whiting is pre-selected for cuttings disposal to specific licensed facilities, indicating a contracted service for the upcoming drill.
Surveying
4 Dimension Surveying & Consulting and Thomas E. Osen are already engaged for plat work, suggesting ongoing or completed survey services for the pad.