๐Ÿ›ข๏ธ Potter 4595 33-29 5B

OASIS PETROLEUM NORTH AMERICA LLC ยท Dunn County, ND ยท File #43371 ยท Generated 2026-10-07 05:28

API
3302505248
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Operator plans a 'wet shoe' completion configuration, intentionally leaving ~400 ft of uncemented annulus at the liner toe to facilitate pump-down perforating.
๐Ÿ“„ Attachment: '1 Well Information' section, '1.11 Wet Shoe' and diagram (Fig. 1.1)
This is a specific engineering design choice aimed at reducing completion costs by avoiding more expensive perforating methods, indicating a deliberate operational strategy.
2026-09-02 Completions / Frac
Tier 3 Well location is on an aquifer, triggering a mandatory onsite inspection and stipulations including a closed mud system, no drilling pit, and an impermeable liner for the entire location.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Information page, 'STIPULATIONS' section
This is a high-risk location requiring extra regulatory oversight and specific environmental safeguards, adding cost and complexity to operations.
2026-10-05 Mud / Fluids
Tier 3 Operator has 'Requested Waiver' for open-hole logs, planning only a Cement Bond Log from the intermediate casing to the surface shoe.
๐Ÿ“„ Attachment: '1 Well Information', '1.7 Evaluation Program'
This represents a cost-saving design choice that deviates from routine data acquisition, impacting service demand for logging contractors.
2026-09-02 Regulatory / Permitting
Tier 3 Operator has declared a pre-approved list of nine specific licensed facilities for solid drill cuttings disposal, stating cuttings 'will be hauled to the closest available facility to the well.'
๐Ÿ“„ Attachment: '1 Well Information', '1.10 Licensed Facilities for Solid Drill Cutting Disposal'
This is a non-routine, explicit pre-selection of a vendor ecosystem for waste disposal, locking in business for the named companies.
2026-09-02 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental & Containment Services
The aquifer stipulation requires immediate NDIC Field Inspector contact and implementation of a closed mud system and full-location impermeable liner before construction, creating urgent demand for liner installation and closed-loop system vendors.
Drilling Waste Hauling & Disposal
The operator's pre-declared list of nine licensed disposal facilities creates a near-term opportunity for those specific vendors once drilling commences, as cuttings must be hauled to the 'closest available' from this list.
Directional Drilling / Surveying
The complex anti-collision environment with many existing wells necessitates precise well planning and real-time surveying services, as indicated in the Anti-Collision Statement and detailed trajectory plans.
Pad Construction & Earthwork
The approved permit and attached construction plans with extensive earthwork quantities (over 60,000 cy of excavation) signal that pad construction is imminent or underway to support this multi-well pad.