๐Ÿ›ข๏ธ Weasley 4595 33-29 2B

OASIS PETROLEUM NORTH AMERICA LLC ยท Dunn County, ND ยท File #43373 ยท Generated 2026-10-07 05:32

API
3302505250
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Approved use of a 'wet shoe' liner configuration for toe initiation, avoiding more expensive tubing-conveyed or tractor methods.
๐Ÿ“„ Wet Shoe configuration details
A specific, non-standard completion design is documented and approved, indicating a planned operational sequence that favors wireline services over alternatives.
2026-10-05 Completions / Frac
Tier 3 Mandatory closed mud system with no drilling pit and impermeable liner for entire location due to aquifer siting.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations / SPECIAL ATTENTION
Non-standard environmental containment requirement imposed by regulator, affecting location construction, drilling waste handling, and cost.
2026-10-05 Mud / Fluids
Tier 3 Operator must contact NDIC Field Inspector Nicole Ewoniuk prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Page 2 - Construction Commencement Notification
A specific inspector is named for pre-construction contact, indicating heightened regulatory oversight for this pad.
2026-10-05 General Oilfield Services
Tier 3 Operator utilizes AC guidance reporting from certified well planners, explicitly naming 'TAKTIKAL DIRECTIONAL'.
๐Ÿ“„ Anti-Collision Statement
Vendor is explicitly named in a critical engineering design section, indicating a pre-selected contractor for well planning and anti-collision services.
2026-09-02 Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Environmental & Location Construction
Mandatory closed mud system and impermeable liner requirement must be implemented before drilling commences. The approved permit date is 2026-10-05, and an anticipated start date of 2025-06-07 is listed, indicating planning is advanced.
Directional Drilling / Well Planning
The operator's anti-collision statement hinges on guidance from a named vendor (TAKTIKAL DIRECTIONAL). With six wells planned from the pad, detailed well path planning and real-time monitoring services are immediately relevant.
Cementing & Completions
The approved 'wet shoe' design dictates a specific cementing program for the production liner. Cementing contractors must execute the precise over-displacement plan to achieve the uncemented annulus for the toe initiation sleeve.
Drilling Waste Disposal
Operator has pre-selected a list of licensed disposal facilities for dry cuttings. Hauling and disposal services to the 'closest available facility' are required upon spud.