| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approved use of a 'wet shoe' liner configuration for toe initiation, avoiding more expensive tubing-conveyed or tractor methods. ๐ Wet Shoe configuration details A specific, non-standard completion design is documented and approved, indicating a planned operational sequence that favors wireline services over alternatives. |
2026-10-05 | Completions / Frac |
| Tier 3 |
Mandatory closed mud system with no drilling pit and impermeable liner for entire location due to aquifer siting.โฐ TIME-SENSITIVE ๐ Permit Stipulations / SPECIAL ATTENTION Non-standard environmental containment requirement imposed by regulator, affecting location construction, drilling waste handling, and cost. |
2026-10-05 | Mud / Fluids |
| Tier 3 |
Operator must contact NDIC Field Inspector Nicole Ewoniuk prior to location construction.โฐ TIME-SENSITIVE ๐ Permit Page 2 - Construction Commencement Notification A specific inspector is named for pre-construction contact, indicating heightened regulatory oversight for this pad. |
2026-10-05 | General Oilfield Services |
| Tier 3 |
Operator utilizes AC guidance reporting from certified well planners, explicitly naming 'TAKTIKAL DIRECTIONAL'. ๐ Anti-Collision Statement Vendor is explicitly named in a critical engineering design section, indicating a pre-selected contractor for well planning and anti-collision services. |
2026-09-02 | Directional Drilling |