| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe completion design specified for toe initiation, avoiding more expensive perforation methods. ๐ 1.11 Wet Shoe / Discussion Reveals a deliberate, cost-saving completion technique that influences liner cementing, displacement, and initial stimulation services. |
Unknown | Completions / Frac |
| Tier 3 |
Anticipated commencement date is June 7, 2025, with approximately 30 drilling days.โฐ TIME-SENSITIVE ๐ 1.8 Anticipated Starting Dates Provides a specific planned start date and duration, indicating operator's forward planning and expected rig time. |
2025-06-07 | Drilling Rigs |
| Tier 3 |
Aquifer location triggers mandatory closed mud system, impermeable liner, and pre-construction inspection. ๐ PERMIT INFORMATION / STIPULATIONS Imposes strict, non-standard environmental controls and requires direct coordination with NDIC Field Inspector before any work begins. |
Unknown | Mud / Fluids |
| Tier 3 |
Logging waiver requested; only a Cement Bond Log planned from intermediate casing to surface shoe. ๐ 1.7 Evaluation Program Operator seeks to forgo standard open-hole logging, reducing evaluation scope but mandating a specific cased-hole log. |
Unknown | Regulatory / Permitting |
| Tier 3 |
Operator must contact NDIC Field Inspector Nicole Ewoniuk prior to location construction. ๐ Page: 2 of 10 Names a specific regulatory inspector as the mandatory point of contact for site-specific stipulations, adding a procedural step. |
Unknown | General Oilfield Services |