| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
North setback justification is based on a 'production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.' ๐ Permit Information, Conditions of Approval Specifies a detailed completion and cementing methodology that is integral to meeting spacing unit setbacks. |
2026-10-06 | Completions / Frac |
| Tier 3 |
Well location on an aquifer triggers mandatory onsite inspection and stringent site-specific stipulations (closed mud system, impermeable liner, perimeter berm).โฐ TIME-SENSITIVE ๐ Permit Information, Stipulations Adds significant pre-spud regulatory compliance steps, cost, and potential for project delay beyond standard permitting. |
2026-10-06 | Mud / Fluids |
| Tier 3 |
MWD Contractor is explicitly listed as 'KLX Directional' in the operator's drilling plan. ๐ Drilling Plan, Section 1 Contractor is named in the operational plan, suggesting a pre-awarded contract for directional services. |
2026-09-23 | Directional Drilling |
| Tier 3 |
Extensive pad construction with ~57,190 cu yds of cut, 20,568 ft of new access road, and detailed interim reclamation plan. ๐ Survey and Earthwork Diagrams The scale of earthwork and detailed civil engineering plans indicate a major site construction project, not just a standard well pad. |
2026-07-14 | General Oilfield Services |
| Tier 3 |
Operator declares intent to submit a sundry notice to waive open hole logs.โฐ TIME-SENSITIVE ๐ Drilling Plan, Section 5 A direct statement of intent to forego standard evaluation services, impacting wireline/logging vendors. |
Relative | General Oilfield Services |