โ† Back to Daily Permits

๐Ÿ›ข๏ธ BR-CJ HANA 36-24H MB

MUREX PETROLEUM CORPORATION ยท Divide County, ND ยท File #43377 ยท Generated 2026-10-12 07:02

API
3302301905
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Well design uses a cemented production liner with a 'wet shoe' (100' of uncemented annulus at the toe) to facilitate wireline operations.
๐Ÿ“„ Wet Shoe Schematic and Discussion
A specialized completion design that dictates specific cementing, plug placement, and fracturing procedures for the first stage.
Relative Completions / Frac
Tier 3 Stipulation: 'Murex must contact NDIC Field Inspector Marc Binns at 701-770-2564 prior to location construction.'
๐Ÿ“„ Permit Stipulations
A named inspector must be contacted, creating a mandatory pre-construction checkpoint.
2026-10-06 General Oilfield Services
Tier 3 Permit stipulation requires this well to be drilled back-to-back with the BR-Dani Autumn 36-24H MB well to justify the spacing unit.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations
Creates a direct dependency, dictating drilling schedule and rig movement between two specific wells.
2026-10-06 Drilling Rigs
Tier 3 Operator plans to drill four wells (BR-Wanda-June 1-13 MB, BR-Micah Andrew 1-13H MB, BR-Dani Autumn 36-24H MB, BR-CJ Hana 36-24H MB) back-to-back from a single pad.โฐ TIME-SENSITIVE
๐Ÿ“„ Drilling Plan Statement letter
Signals a concentrated, sequential drilling campaign, indicating sustained activity and potential for repeat services.
2026-10-02 General Oilfield Services
Tier 3 Operator declares all drill cuttings for the four-well pad will be disposed of at Smokey Butte Disposal.
๐Ÿ“„ Drill Cuttings Statement
Explicitly names a waste disposal contractor, securing that service for the entire drilling program.
2026-10-02 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Directional Services
A multi-well, back-to-back drilling program is explicitly planned, with a rig (H&P 515) and directional contractor (Taktikal Directional) named. The permit stipulation ties the spud of this well to another, creating a sequenced opportunity.
Waste Disposal & Logistics
Operator has pre-selected Smokey Butte Disposal for all drill cuttings from the four-well pad, indicating a secured, ongoing service need for the duration of the pad's drilling.
Civil Construction & Surveying
Detailed pad construction plans exist, and a surveyor (4DIMENSION SURVEYINE & CONSULTING) is named. Location construction cannot begin until inspector contact is made, timing earthwork services.
Completion & Stimulation Services
The approved 'wet shoe' well design dictates specific plug-and-perf and fracture initiation procedures for the first stage, influencing service needs during completion.