| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe liner design with specific isolation procedure for first-stage fracturing. ๐ DRILLING PROGRAM / WET SHOE SCHEMATIC Non-standard cemented liner completion with a deliberate uncemented annulus at the toe, requiring a specific plug-and-perf sequence to isolate it during stimulation. |
Unknown | Completions / Frac |
| Tier 3 |
Permitting flagged for potential federal (BLM) documentation requirements due to federal minerals in spacing unit.โฐ TIME-SENSITIVE ๐ Email from Doug Jackson, NDIC Introduces a potential regulatory step (BLM approval) that must be resolved before operations can commence, adding uncertainty and possible delay. |
2026-10-05 | General Oilfield Services |
| Tier 3 |
Drilling plan changed to co-locate 4 wells from two DSUs on a single pad under two back-to-back programs. ๐ October 2, 2026 RE: Drilling Plan Statement Significant change from original plan of separate pads, consolidating activity and indicating pad construction and drilling services will be concentrated. |
2026-10-02 | Drilling Rigs |
| Tier 3 |
Operator secured a Surface Use Agreement amendment specifically authorizing drilling both DSUs from the same location. ๐ AFFIDAVIT (Jake Scott) Recent land agreement (July 2026 amendment) was a prerequisite for the changed multi-well pad plan, showing recent successful negotiation. |
2026-09-29 | General Oilfield Services |
| Tier 3 |
Mandatory back-to-back drilling with adjacent well to justify spacing unit.โฐ TIME-SENSITIVE ๐ PERMIT INFORMATION / STIPULATIONS Creates a rigid, time-sensitive operational sequence linking the fates of two wells, forcing immediate follow-on activity. |
Unknown | Drilling Rigs |