โ† Back to Daily Permits

๐Ÿ›ข๏ธ BR-MICAH ANDREW 1-13H MB

MUREX PETROLEUM CORPORATION ยท Divide County, ND ยท File #43379 ยท Generated 2026-10-08 04:43

API
3302301907
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Well design uses a cemented production liner with a 'wet shoe' (100' of uncemented annulus at the toe) to facilitate wireline operations for the first stage.
๐Ÿ“„ WET SHOE SCHEMATIC / Discussion
This is a deliberate engineering design deviation from a standard cemented liner, impacting cementing program execution and initial completion methodology.
Relative Completions / Frac
Tier 3 Permit condition mandates this well be drilled back-to-back with the BR-Wanda June 1-13H MB well to justify the spacing unit.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Information / STIPULATIONS
This is a binding regulatory condition that dictates operational sequencing, creating a guaranteed, contiguous work scope for the drilling contractor and pad crew.
2026-10-06 General Oilfield Services
Tier 3 Operator secured a Surface Use Agreement to drill two DSUs from the same location, changing the plan from separate pads to a single pad for all wells.
๐Ÿ“„ Drilling Plan Statement
This is a significant change in development strategy, consolidating operations and indicating advanced surface negotiation success.
2026-10-02 Drilling Rigs
Tier 3 Rig is explicitly designated as 'H&P 515' in the drilling program target details.
๐Ÿ“„ Drilling Program / TARGET DETAILS
The rig is specified by name and number in the operational plan, indicating contractor selection is finalized, not tentative.
2026-09-14 Drilling Rigs
Tier 3 Drill cuttings for this well and three sister wells are designated for disposal at 'Smokey Butte Disposal'.
๐Ÿ“„ Drill Cuttings Statement
The disposal vendor is explicitly named for a multi-well program, showing a pre-arranged waste management plan.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Rig Operations
The permit mandates back-to-back drilling with a sister well, and the rig (H&P 515) is specified, indicating an imminent, sequenced campaign.
Cementing & Wellbore Construction
The approved 'wet shoe' liner design requires precise cementing execution to create the 100' uncemented annulus, a non-routine procedure.
Waste & Environmental Services
A specific disposal facility (Smokey Butte Disposal) is contractually designated for cuttings from this four-well pad program.
Directional Drilling & Surveying
Detailed directional plans and survey programs are filed, with specific MWD tool (OWSG) noted, indicating advanced planning for precise well placement.