| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Well design uses a cemented production liner with a 'wet shoe' (100' of uncemented annulus at the toe) to facilitate wireline operations for the first stage. ๐ WET SHOE SCHEMATIC / Discussion This is a deliberate engineering design deviation from a standard cemented liner, impacting cementing program execution and initial completion methodology. |
Relative | Completions / Frac |
| Tier 3 |
Permit condition mandates this well be drilled back-to-back with the BR-Wanda June 1-13H MB well to justify the spacing unit.โฐ TIME-SENSITIVE ๐ Permit Information / STIPULATIONS This is a binding regulatory condition that dictates operational sequencing, creating a guaranteed, contiguous work scope for the drilling contractor and pad crew. |
2026-10-06 | General Oilfield Services |
| Tier 3 |
Operator secured a Surface Use Agreement to drill two DSUs from the same location, changing the plan from separate pads to a single pad for all wells. ๐ Drilling Plan Statement This is a significant change in development strategy, consolidating operations and indicating advanced surface negotiation success. |
2026-10-02 | Drilling Rigs |
| Tier 3 |
Rig is explicitly designated as 'H&P 515' in the drilling program target details. ๐ Drilling Program / TARGET DETAILS The rig is specified by name and number in the operational plan, indicating contractor selection is finalized, not tentative. |
2026-09-14 | Drilling Rigs |
| Tier 3 |
Drill cuttings for this well and three sister wells are designated for disposal at 'Smokey Butte Disposal'. ๐ Drill Cuttings Statement The disposal vendor is explicitly named for a multi-well program, showing a pre-arranged waste management plan. |
Unknown | General Oilfield Services |