๐Ÿ›ข๏ธ BR-WANDA JUNE 1-13H MB

MUREX PETROLEUM CORPORATION ยท Divide County, ND ยท File #43380 ยท Generated 2026-10-08 04:45

API
3302301908
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval includes condition due to a production liner cemented in the lateral with a wet shoe and no ability to frac out the shoe.
๐Ÿ“„ Drilling Program - Wet Shoe Schematic
The permit stipulation is directly tied to a specific, non-standard completion design (wet shoe), affecting cementing and stimulation plans.
2026-10-06 Completions / Frac
Tier 3 Well must be drilled back-to-back with the BR-Micah Andrew 1-13H MB well to justify the spacing unit.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations
Regulatory condition creates a firm, sequential drilling schedule, not just a permit. This locks in rig and service timing.
2026-10-06 Drilling Rigs
Tier 3 Murex must contact NDIC Field Inspector Marc Binns at 701-770-2564 prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations
A direct, personal contact requirement for a specific inspector is a non-routine condition that must be fulfilled before pad construction can begin.
2026-10-06 General Oilfield Services
Tier 3 Murex has elected to adjust the original drilling program. Rather than drill 5 wells in each DSU on separate pads and separate drilling programs, Murex has elected to drill all of the wells from the same pad.
๐Ÿ“„ Drilling Plan Statement
Demonstrates a significant change in development strategy, consolidating pads which impacts earthwork, pad construction, and logistics.
2026-10-02 Drilling Rigs
Tier 3 Rig: H&P 515 is specified in the directional plan.โฐ TIME-SENSITIVE
๐Ÿ“„ Drilling Program - Directional Plan
The rig is explicitly named in the directional plan dated before the permit approval, showing advanced operational planning.
2026-09-14 Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Directional Services
Rig H&P 515 is pre-selected and the well must be drilled back-to-back with another, creating a firm, immediate sequence of work.
Cementing
The approved well design features a cemented liner with a 'wet shoe', requiring precise cementing services for both the intermediate casing and production liner.
Earthwork & Pad Construction
The operator consolidated a multi-well program onto a single pad, requiring pad construction and earthwork to accommodate four wells back-to-back.
Surveying
A specific surveying contractor (4 Dimension Surveying & Consulting) prepared the well location plat, indicating a pre-existing relationship for pad and well path planning.