โ† Back to Daily Permits

๐Ÿ›ข๏ธ Lovegood Federal 4595 42-19 3B

OASIS PETROLEUM NORTH AMERICA LLC ยท Dunn County, ND ยท File #43385 ยท Generated 2026-10-09 06:22

API
3302505252
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval conditional on a 'wet shoe' completion configuration for the production liner.
๐Ÿ“„ Permit Conditions / Completion & Perforation
The permit condition explicitly describes a non-standard 'wet shoe' configuration where the liner cement is intentionally over-displaced, leaving an uncemented annulus at the toe to facilitate wireline perforation.
Unknown Completions / Frac
Tier 3 Waiver requested for notifying adjacent operator due to traversing adjacent spacing unit, as Oasis is the operator of that unit.
๐Ÿ“„ Operator Letter (September 2nd, 2026)
The wellbore is designed to enter the target formation from outside its designated spacing unit, crossing into an adjacent unit. A regulatory waiver is sought because the operator controls both units.
2026-09-02 Regulatory / Permitting
Tier 3 Affidavit confirms Surface Use Agreement executed for drilling 'off-lease' wells from this pad location.
๐Ÿ“„ Affidavit Affirming Surface Use Agreement
Surface access for multiple wells (including this one) targeting units not under the surface lease was secured via a specific agreement, documented by an affidavit.
2026-08-25 General Oilfield Services
Tier 3 Permit includes a specific setback condition based on the cemented production liner with a wet shoe and ability to 'frac out the shoe'.
๐Ÿ“„ Stipulations / Conditions of Approval
The south boundary setback is explicitly tied to the 'wet shoe' completion design and the planned fracture stimulation operation.
Unknown Completions / Frac
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Construction Commencement Notification
A specific inspector is named for pre-construction contact, indicating a regulatory point of contact and a procedural step that gates the start of pad construction.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Wireline Perforation
The approved 'wet shoe' completion design is specifically intended to enable pump-down wireline perforation for the first stage, creating a direct service opportunity post-drilling.
Surveying & Well Planning
Complex anti-collision planning is required for pad drilling with multiple wellbores, and a specific surveying contractor (4DIMENSION) is already engaged, indicating ongoing needs.
Regulatory & Inspection Coordination
A named NDIC field inspector must be contacted before construction begins, indicating a time-sensitive coordination step for any earthwork or pad-building contractors.