| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on a 'wet shoe' completion configuration for the production liner. ๐ Permit Conditions / Completion & Perforation The permit condition explicitly describes a non-standard 'wet shoe' configuration where the liner cement is intentionally over-displaced, leaving an uncemented annulus at the toe to facilitate wireline perforation. |
Unknown | Completions / Frac |
| Tier 3 |
Waiver requested for notifying adjacent operator due to traversing adjacent spacing unit, as Oasis is the operator of that unit. ๐ Operator Letter (September 2nd, 2026) The wellbore is designed to enter the target formation from outside its designated spacing unit, crossing into an adjacent unit. A regulatory waiver is sought because the operator controls both units. |
2026-09-02 | Regulatory / Permitting |
| Tier 3 |
Affidavit confirms Surface Use Agreement executed for drilling 'off-lease' wells from this pad location. ๐ Affidavit Affirming Surface Use Agreement Surface access for multiple wells (including this one) targeting units not under the surface lease was secured via a specific agreement, documented by an affidavit. |
2026-08-25 | General Oilfield Services |
| Tier 3 |
Permit includes a specific setback condition based on the cemented production liner with a wet shoe and ability to 'frac out the shoe'. ๐ Stipulations / Conditions of Approval The south boundary setback is explicitly tied to the 'wet shoe' completion design and the planned fracture stimulation operation. |
Unknown | Completions / Frac |
| Tier 3 |
Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location construction.โฐ TIME-SENSITIVE ๐ Construction Commencement Notification A specific inspector is named for pre-construction contact, indicating a regulatory point of contact and a procedural step that gates the start of pad construction. |
Relative | General Oilfield Services |