๐Ÿ›ข๏ธ Lovegood Federal 4595 42-19 4B

OASIS PETROLEUM NORTH AMERICA LLC ยท Dunn County, ND ยท File #43386 ยท Generated 2026-10-09 06:23

API
3302505253
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Permit approval includes a 150' setback from north & south boundaries and 500' from east & west within a 2560-acre spacing unit, with the south setback based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.
๐Ÿ“„ Permit Information / Stipulations
The setback condition is tied to a specific well design (wet shoe) for toe initiation, indicating a planned completion technique that influences regulatory spacing compliance.
Unknown Completions / Frac
Tier 2 The 'wet shoe' configuration is explicitly designed for toe initiation, allowing pump-down of first stage perforating guns on wireline to avoid more expensive tubing or tractor methods.
๐Ÿ“„ Section 1.11 Wet Shoe
Detailed engineering design choice favoring a specific, cost-effective completion method, locking in a need for precise liner cementing and wireline perforating services.
Unknown Completions / Frac
Tier 3 Operator requests a waiver from adjacent operator notification for off-spacing wells because Oasis is the operator of the adjacent spacing unit.โฐ TIME-SENSITIVE
๐Ÿ“„ September 2nd, 2026 letter
Explicit waiver request based on operator's own adjacent unit control, streamlining approval and revealing integrated unit development strategy.
2026-09-02 Regulatory / Permitting
Tier 3 Anticipated commencement date is June 7, 2025, with approximately 30 drilling days, stated in a document dated 2026.
๐Ÿ“„ Section 1.8 Anticipated Starting Dates
A planned start date over a year in the past relative to the document date suggests the plan is outdated or significantly delayed, indicating potential schedule slippage or revised timing.
2025-06-07 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location construction and notify immediately upon spudding.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2, Construction Commencement Notification
Specific inspector named and immediate spud notification required, indicating heightened regulatory oversight and a strict operational sequence.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Wireline Perforating
The wet shoe design is specifically intended to enable pump-down wireline perforating for the first stage, creating a direct service opportunity.
Liner Cementing
The wet shoe configuration requires precise cementing of the production liner to create an uncemented annulus at the toe; this is critical for the approved design.
Drilling & Completions Planning
The stated anticipated start date (June 2025) is historically past the document date, indicating potential schedule revision and need for updated planning and coordination.