๐Ÿ›ข๏ธ Lovegood Federal 4595 42-19 5B

OASIS PETROLEUM NORTH AMERICA LLC ยท Dunn County, ND ยท File #43387 ยท Generated 2026-10-09 06:26

API
3302505254
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Permit condition includes 150' north/south and 500' east/west setbacks within a 2560-acre spacing unit, with south setback based on cemented production liner with wet shoe.
๐Ÿ“„ Permit Information - STIPULATIONS
Setback distances are tied to a specific completion design (wet shoe), making regulatory approval conditional on operational execution.
Unknown Directional Drilling
Tier 2 Wet shoe completion design for toe initiation to avoid expensive perforating methods
๐Ÿ“„ Attachment/Drilling & Proposed Work Statements
Non-standard liner cementing technique intentionally leaves 400' of uncemented annulus to enable pump-down wireline perforation, indicating a cost-saving operational design choice.
Relative Completions / Frac
Tier 3 Waiver requested for adjacent operator notification per Order No. 31973 because Oasis is the operator of the adjacent spacing unit.
๐Ÿ“„ Letter from Ryan Emery dated September 2nd, 2026
Seeks regulatory waiver based on common ownership, streamlining the permitting process for multi-well pad.
2026-09-02 Regulatory / Permitting
Tier 3 Anticipated commencement date is June 7, 2025, with approximately 30 drilling days.โฐ TIME-SENSITIVE
๐Ÿ“„ Attachment - Anticipated Starting Dates
Specific planned start date and duration provided, indicating advanced scheduling.
2025-06-07 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 - Construction Commencement Notification
Explicit pre-construction contact requirement with a named inspector creates a regulatory gate before pad work begins.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Directional Services
Anticipated spud date of June 7, 2025, with a 30-day drilling program; anti-collision statement indicates need for precise well planning and real-time surveying.
Completion & Stimulation Services
Wet shoe design dictates specific cementing and perforating operations; facility statement mentions indirect heater with setback exemption, indicating tailored production equipment.
Civil Construction & Earthwork
New pad construction statement details earthwork quantities and materials; operator must contact inspector before construction, indicating imminent site work.
Waste & Cuttings Disposal
Document lists multiple licensed disposal facilities for dry cuttings; filter sock container requirement indicates ongoing waste management needs from spud through flowback.