| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit condition includes 150' north/south and 500' east/west setbacks within a 2560-acre spacing unit, with south setback based on cemented production liner with wet shoe. ๐ Permit Information - STIPULATIONS Setback distances are tied to a specific completion design (wet shoe), making regulatory approval conditional on operational execution. |
Unknown | Directional Drilling |
| Tier 2 |
Wet shoe completion design for toe initiation to avoid expensive perforating methods ๐ Attachment/Drilling & Proposed Work Statements Non-standard liner cementing technique intentionally leaves 400' of uncemented annulus to enable pump-down wireline perforation, indicating a cost-saving operational design choice. |
Relative | Completions / Frac |
| Tier 3 |
Waiver requested for adjacent operator notification per Order No. 31973 because Oasis is the operator of the adjacent spacing unit. ๐ Letter from Ryan Emery dated September 2nd, 2026 Seeks regulatory waiver based on common ownership, streamlining the permitting process for multi-well pad. |
2026-09-02 | Regulatory / Permitting |
| Tier 3 |
Anticipated commencement date is June 7, 2025, with approximately 30 drilling days.โฐ TIME-SENSITIVE ๐ Attachment - Anticipated Starting Dates Specific planned start date and duration provided, indicating advanced scheduling. |
2025-06-07 | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location construction.โฐ TIME-SENSITIVE ๐ Page 2 - Construction Commencement Notification Explicit pre-construction contact requirement with a named inspector creates a regulatory gate before pad work begins. |
Relative | General Oilfield Services |