| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Permit flagged for potential Federal (BLM) permit requirements due to federal minerals in the spacing unit.โฐ TIME-SENSITIVE ๐ Email from Nathaniel Erbele dated 10/8/2026 The NDIC permitting engineer explicitly directs the operator to contact the BLM, indicating the spacing unit contains federal minerals requiring additional clearance. |
2026-10-08 | General Oilfield Services |
| Tier 3 |
Drill cuttings disposal contractor pre-selected: Dishon Disposal (Select).โฐ TIME-SENSITIVE ๐ Proposed Drilling Plan section A specific, licensed disposal facility is named in the approved permit's waste disposal plan, indicating a contracted vendor. |
2026-10-08 | General Oilfield Services |
| Tier 3 |
Mandatory pre-construction contact with a specific NDIC Field Inspector: Jessica Gilkey.โฐ TIME-SENSITIVE ๐ Stipulations section, page 1 The permit condition names a specific inspector and requires contact before location work begins, which is operator-specific and not a generic requirement. |
2026-10-08 | General Oilfield Services |
| Tier 3 |
Drilling rig pre-selected: Nabors B21.โฐ TIME-SENSITIVE ๐ Permit Plan 1 (1710FNL) diagram notes The rig contractor and specific rig number are explicitly named in the well plan, indicating a locked-in contract ahead of spud. |
2026-09-11 | Drilling Rigs |