โ† Back to Daily Permits

๐Ÿ›ข๏ธ SHIV 13-24-25-36 1H

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43398 ยท Generated 2026-10-13 06:17

API
3305310902
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations, Page 1
This is a mandatory, person-specific contact required before any ground disturbance, indicating a controlled start sequence.
2026-10-12 General Oilfield Services
Tier 3 A covered leak-proof container for filter sock disposal must be maintained on site from spud through clean-out, completion, and flow-back whenever filtration is conducted.
๐Ÿ“„ Permit Stipulations, Page 9
This is a condition of approval that governs waste management across multiple operational phases, not a one-time activity.
2026-10-12 General Oilfield Services
Tier 3 Operator has pre-designated a licensed disposal facility for drill cuttings: Select Water Solutions, LLC Special Waste Landfill.
๐Ÿ“„ Proposed Drilling Plan, Section 4
The disposal plan is specified in the approved drilling program, not left open. This vendor is explicitly named for a key waste stream.
2026-06-13 General Oilfield Services
Tier 3 Production liner cement tail slurry specified as 'Class G/POZ, 3% Barite, 0.1% Dispersant, 0.35% AS Agent, 0.5% FL, 0.5% Viscosifier, 1.18% Retarder'.
๐Ÿ“„ Proposed Drilling Plan, Section 2 (Production Liner)
The cement design includes multiple specific additives (POZ, Barite, AS Agent) which is a detailed, engineered specification beyond a standard Class G slurry.
2026-06-13 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling Waste Hauling & Disposal
The approved drilling plan explicitly names Select Water Solutions as the disposal facility for cuttings, indicating a contracted service opportunity for hauling to that specific landfill.
Specialized Cementing Services
The detailed, additive-rich cement design for the production liner suggests a need for precise slurry blending and pumping services, likely requiring an engineered cement job.
Location Construction & Earthwork
The permit requires contact with a specific NDIC inspector before construction begins, and the attached plat shows detailed earthwork quantities and a multi-well pad layout, indicating imminent site build-out.
Filter & Waste Container Services
The mandatory on-site leak-proof container for filter socks from spud through flowback creates a need for container supply, placarding, and potentially rental/management services for an extended duration.