| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location construction.โฐ TIME-SENSITIVE ๐ Permit Stipulations, Page 1 This is a mandatory, person-specific contact required before any ground disturbance, indicating a controlled start sequence. |
2026-10-12 | General Oilfield Services |
| Tier 3 |
A covered leak-proof container for filter sock disposal must be maintained on site from spud through clean-out, completion, and flow-back whenever filtration is conducted. ๐ Permit Stipulations, Page 9 This is a condition of approval that governs waste management across multiple operational phases, not a one-time activity. |
2026-10-12 | General Oilfield Services |
| Tier 3 |
Operator has pre-designated a licensed disposal facility for drill cuttings: Select Water Solutions, LLC Special Waste Landfill. ๐ Proposed Drilling Plan, Section 4 The disposal plan is specified in the approved drilling program, not left open. This vendor is explicitly named for a key waste stream. |
2026-06-13 | General Oilfield Services |
| Tier 3 |
Production liner cement tail slurry specified as 'Class G/POZ, 3% Barite, 0.1% Dispersant, 0.35% AS Agent, 0.5% FL, 0.5% Viscosifier, 1.18% Retarder'. ๐ Proposed Drilling Plan, Section 2 (Production Liner) The cement design includes multiple specific additives (POZ, Barite, AS Agent) which is a detailed, engineered specification beyond a standard Class G slurry. |
2026-06-13 | General Oilfield Services |