๐Ÿ›ข๏ธ SHIV 13-24-25-36 2H

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43399 ยท Generated 2026-10-13 06:18

API
3305310903
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Drill cuttings disposal contract pre-awarded to Select Water Solutions, LLC Special Waste Landfill.โฐ TIME-SENSITIVE
๐Ÿ“„ Proposed Drilling Plan section 4.
The permit explicitly names a specific waste disposal facility and its address, indicating a pre-arranged disposal plan, which is a non-routine procurement signal.
2026-10-12 General Oilfield Services
Tier 3 Explicit regulatory reminder and reinforcement of the filter-sock container rule, effective June 1, 2014.
๐Ÿ“„ Regulatory letter appended to the file.
A dated regulatory letter from the NDIC Assistant Director is included in the file, underscoring a specific, ongoing compliance mandate for leak-proof filter containers, indicating enforcement focus.
2026-07-29 General Oilfield Services
Tier 3 Directional well plan and survey report prepared by TAKTIKAL DIRECTIONAL.
๐Ÿ“„ Proposed drilling plan diagram and planning report annotations.
The directional plan is explicitly branded by a specific service provider, TAKTIKAL DIRECTIONAL, which is non-routine vendor selection evidence embedded in the engineering design.
2026-06-13 Directional Drilling
Tier 3 Comprehensive pad design, surveying, and earthwork planning executed by Uintah Engineering and Land Surveying (UELS).
๐Ÿ“„ Pad layout, cross-sections, and various plat drawings.
The detailed pad layout, earthwork quantities, and survey plats are stamped and prepared by UELS, showing deep, pre-spud involvement in surface planning beyond routine permit filing.
2026-05-19 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / Surveying
The directional plan is complete and dated June 2026; drilling permit was approved October 2026. The engagement of TAKTIKAL DIRECTIONAL for planning signals imminent drilling operations requiring execution of their plan.
Waste Hauling & Disposal
The permit mandates use of 'Select Water Solutions, LLC Special Waste Landfill'. This vendor must be contacted for hauling and disposal services as soon as drilling commences to comply with permit conditions.
Civil Construction & Earthwork
The detailed pad design and 65,430 cu yd earthwork plan by UELS is approved. Construction must commence after permit approval and notification to the NDIC inspector, indicating near-term grading and pad building activity.
Regulatory Compliance & Site Services
The permit requires immediate notification to a specific NDIC Field Inspector (Doug Dolyniuk) prior to location construction and upon spudding, creating a time-critical coordination point and underscoring need for strict adherence to container and berm rules.