| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditioned on 150' north/south and 500' east/west setbacks within a 2560-acre unit, with south setback based on a cemented production liner with a wet shoe and ability to frac out the shoe. ๐ Permit Information / Stipulations Specific, non-standard setback conditions tied to a unique completion design (wet shoe) indicate a tailored regulatory approval for this pad's geometry and fracture plan. |
Unknown | Completions / Frac |
| Tier 3 |
Operator asserts the well is located off-spacing and supplies an affidavit of a surface use agreement for the multi-well pad. ๐ Operator Assertions / Affidavit of Surface Damage Agreement Off-spacing operation from a surface location in Section 12 targeting units in other sections requires a confirmed surface agreement, indicating complex pad planning. |
2026-09-21 | General Oilfield Services |
| Tier 3 |
Operator submits waiver request for 'Backbuild Order' notification, citing that Phoenix Energy is the majority working interest owner in adjacent units.โฐ TIME-SENSITIVE ๐ Letter from Phoenix Energy dated June 17th, 2026 Seeks regulatory waiver based on internal ownership, streamlining approval for wells entering target spacing unit from outside. |
2026-06-17 | Regulatory / Permitting |
| Tier 3 |
Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location construction.โฐ TIME-SENSITIVE ๐ Conditions of Approval Pre-construction inspector contact is a specific, mandated step not required for all wells, indicating heightened regulatory oversight for this pad. |
Relative | General Oilfield Services |
| Tier 3 |
Drill cuttings to be hauled to Select Water Solutions, LLC Special Waste Landfill. ๐ Proposed Drilling Plan - Disposal of Drill Cuttings Pre-selected, named waste disposal vendor and facility is specified in the approved plan, locking in a service provider. |
Unknown | General Oilfield Services |