๐Ÿ›ข๏ธ SHIV 13-24-25-36 3H

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43401 ยท Generated 2026-10-14 06:25

API
3305310904
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Permit includes a specific condition for a production liner cemented in the lateral with a wet shoe, requiring the ability to frac out the shoe.
๐Ÿ“„ Permit Information / Conditions of Approval
Specifies a non-standard completion design requirement (wet shoe with frac-out capability) as a condition of approval, indicating a tailored engineering solution for this well.
Unknown Completions / Frac
Tier 3 Operator filed for a waiver from 'backbuild order' notification requirements because it is the majority working interest owner in adjacent units.
๐Ÿ“„ Letter from Meaghan Coughlan dated June 17th, 2026
Demonstrates proactive regulatory strategy to streamline operations by leveraging its own ownership position, avoiding external notifications.
2026-06-17 Regulatory / Permitting
Tier 3 Operator must contact NDIC Field Inspector Doug Dolyniuk prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Information / Stipulations
Identifies a specific, named inspector and a pre-construction contact requirement, adding a procedural step and potential scheduling consideration.
Relative General Oilfield Services
Tier 3 Drill cuttings disposal contract explicitly awarded to Select Water Solutions, LLC Special Waste Landfill.
๐Ÿ“„ Proposed Drilling Plan / Disposal of Drill Cuttings
Pre-selects a specific waste disposal vendor and facility, locking in that service and excluding competitors for this operational phase.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / Surveying
Detailed directional plan with specific survey requirements and anti-collision checks needed for precise wellbore placement across sections.
Cementing / Completion Services
Permit condition mandates a production liner cemented in the lateral with a wet shoe capable of being fraced out, requiring specialized design and execution.
Earthwork / Pad Construction
Large-scale pad construction with detailed cut/fill plans, berms, and drainage management required before drilling can commence.