| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Permit includes a 'SPECIAL ATTENTION' stipulation for unstable soils adjacent to the site, requiring immediate inspector notification, potential cessation of work, and a possible geotechnical report prior to facility construction. ๐ Permit stipulations section dated 10/14/2026. This is a conditional, event-driven requirement tied to field observations during construction. It creates a potential immediate need for geotechnical engineering services and alters standard construction workflow. |
2026-10-14 | Drilling Rigs |
| Tier 3 |
Regulatory reminder letter from NDIC reinforcing the mandatory use of leak-proof, covered, placarded containers for filter socks from spud through flowback, with a reference to a 2014 rule. ๐ NDIC letter 'RE: Filter Socks and Other Filter Media' dated July 29, 2026. While the rule is not new, the issuance of a specific reminder letter close to the permit date underscores ongoing regulatory focus, creating a consistent service requirement for waste handling and container supply. |
2026-07-29 | General Oilfield Services |
| Tier 3 |
Extensive, recently finalized (Dec 2024) survey and legal work for pad, road, pipeline, and utility rights-of-way on tribal lands, totaling 53.255 acres across multiple allotments.โฐ TIME-SENSITIVE ๐ Survey plats and legal descriptions with dates of 12/18/2024 and a surveyor's certificate for field work on 06/26/2023. The scale and complexity of the rights-of-way (permanent and temporary, with overlaps) indicate major surface preparation is imminent or underway. The recent date suggests this is a current project phase. |
2024-12-18 | Drilling Rigs |
| Tier 3 |
Pad and access road design specifically engineered to avoid all identified active and non-active landslide areas, with a detailed list of construction and compaction specifications. ๐ Geotechnical report letter dated January 28, 2024 The geotechnical evaluation drives specific, non-negotiable construction protocols (e.g., benching, over-excavation, compaction to 95% Proctor) and requires ongoing engineering inspection, moving beyond routine pad building. |
2024-01-28 | General Oilfield Services |