๐Ÿ›ข๏ธ Clark South 33-32-31F XS 1TFH

DEVON ENERGY WILLISTON, L.L.C. ยท Dunn County, ND ยท File #43407 ยท Generated 2026-10-15 06:32

API
3302505257
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Permit includes a 'SPECIAL ATTENTION' stipulation for unstable soils adjacent to the site, requiring immediate inspector notification, potential cessation of work, and a possible geotechnical report prior to facility construction.
๐Ÿ“„ Permit stipulations section dated 10/14/2026.
This is a conditional, event-driven requirement tied to field observations during construction. It creates a potential immediate need for geotechnical engineering services and alters standard construction workflow.
2026-10-14 Drilling Rigs
Tier 3 Regulatory reminder letter from NDIC reinforcing the mandatory use of leak-proof, covered, placarded containers for filter socks from spud through flowback, with a reference to a 2014 rule.
๐Ÿ“„ NDIC letter 'RE: Filter Socks and Other Filter Media' dated July 29, 2026.
While the rule is not new, the issuance of a specific reminder letter close to the permit date underscores ongoing regulatory focus, creating a consistent service requirement for waste handling and container supply.
2026-07-29 General Oilfield Services
Tier 3 Extensive, recently finalized (Dec 2024) survey and legal work for pad, road, pipeline, and utility rights-of-way on tribal lands, totaling 53.255 acres across multiple allotments.โฐ TIME-SENSITIVE
๐Ÿ“„ Survey plats and legal descriptions with dates of 12/18/2024 and a surveyor's certificate for field work on 06/26/2023.
The scale and complexity of the rights-of-way (permanent and temporary, with overlaps) indicate major surface preparation is imminent or underway. The recent date suggests this is a current project phase.
2024-12-18 Drilling Rigs
Tier 3 Pad and access road design specifically engineered to avoid all identified active and non-active landslide areas, with a detailed list of construction and compaction specifications.
๐Ÿ“„ Geotechnical report letter dated January 28, 2024
The geotechnical evaluation drives specific, non-negotiable construction protocols (e.g., benching, over-excavation, compaction to 95% Proctor) and requires ongoing engineering inspection, moving beyond routine pad building.
2024-01-28 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
The geotechnical report and permit stipulations mandate specific, non-standard construction techniques (benching, over-excavation, strict compaction) and require engineering inspection. The extensive, recently surveyed rights-of-way indicate pad and road construction is a current or imminent activity.
Surveying & Right-of-Way Acquisition
The complex, multi-allotment tribal land rights-of-way totaling over 53 acres were just finalized in December 2024. This suggests the surface acquisition phase is complete, but as-built surveying and potential ongoing right-of-way support may be required during construction.
Environmental & Waste Management
The explicit NDIC reminder on filter sock containers and the permit requirement for a closed mud system and perimeter berm create defined needs for waste handling equipment and services from spud through flowback.
Geotechnical Engineering & Monitoring
The 'SPECIAL ATTENTION' soil instability stipulation creates a contingent need for geotechnical reporting and a long-term visual monitoring program, which could be triggered at any time during or after construction.