๐Ÿ›ข๏ธ MESSERSMITH 14-11-2-35 3H

Phoenix Operating LLC ยท Mountrail County, ND ยท File #43410 ยท Generated 2026-10-16 06:56

API
3306105723
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Approval condition requires a 150' north/south and 500' east/west setback within a 2560-acre unit, with north setback based on a production liner cemented in lateral with a wet shoe and ability to frac out the shoe.
๐Ÿ“„ Permit Stipulations
Specific, non-standard setback distances tied to a unique completion design (cemented liner with wet shoe) for geosteering or fracture containment.
Unknown Directional Drilling
Tier 3 Operator notified EOG RESOURCES, INC. and SOGC, INC. of directional plan as required for wellbores entering Bakken outside target spacing unit.
๐Ÿ“„ Affidavit by Tori Siemieniewski
Reveals specific adjacent operators (EOG, SOGC) were formally notified of cross-unit drilling, indicating potential subsurface coordination or unit development sequencing.
2026-10-12 Directional Drilling
Tier 3 Affidavit confirms surface use agreement for off-spacing wells (MESSERSMITH, VICTORIA, GEORGE) from a pad in Section 23.
๐Ÿ“„ Affidavit of Surface Damage Agreement
Explicitly ties this well to a multi-well pad development plan with off-spacing units, confirming pad-scale operator intent.
2026-10-12 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Dylan Roach prior to location construction.
๐Ÿ“„ Construction Commencement Notification
Pre-construction contact with a specific inspector is a mandatory gate, adding a procedural step and potential timing variable.
Relative Drilling Rigs

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & MWD
The approved directional plan shows a long lateral (~20,730 ft) with specific survey frequency requirements; precise geosteering is critical to stay within the 150' north/south setback.
Cementing & Completions
The permit condition mandates a cemented production liner with a wet shoe for fracture control, creating a specific need for specialized liner cementing and toe sleeve/frac-out equipment.
Earthwork & Pad Construction
A mandatory pre-construction call with Inspector Dylan Roach is required, and the pad is designed for multiple wells, indicating imminent ground-breaking and extended pad construction activity.