| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditional on 150' north/south and 500' east/west setbacks within Alger-Bakken Unit, with south setback based on production liner cemented in lateral with wet shoe and ability to frac out the shoe. ๐ Permit Information / Stipulations Imposes specific, non-standard geometric constraints on well placement and completion design within a unitized area, requiring precise engineering. |
Unknown | Directional Drilling |
| Tier 3 |
Affidavit states no diesel fuel will be used in hydraulic fracturing for four subject wells (Ross 58-0615H, 115-0515H, 59-0515H, 116-0515H). ๐ Affidavit in Re Hydraulic Fracture Fluids Formal, pre-emptive regulatory compliance filing for a multi-well pad, locking in non-diesel frac fluid design. |
2026-09-28 | Completions / Frac |
| Tier 3 |
Waiver requested for proposed logs (Acoustic/Sonic, Cased Hole, etc.). ๐ Page 4 - PROPOSED LOGS Operator seeks regulatory waiver for standard evaluation logs, indicating a potential shift towards reduced data acquisition or reliance on alternative methods. |
Unknown | Regulatory / Permitting |
| Tier 3 |
Operator must contact NDIC Field Inspector Dylan Roach prior to location construction. ๐ Page 2 - Construction Commencement Notification Specifies a named individual for pre-construction contact, indicating heightened regulatory oversight or site-specific coordination requirements. |
Relative | General Oilfield Services |