๐Ÿ›ข๏ธ Ross 115-0515H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #43412 ยท Generated 2026-10-16 06:58

API
3306105725
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Approval conditioned on a cemented production liner with a 'wet shoe' to allow fracturing out of the shoe, with a specific cement slurry (SanTail WB) and liner hanger system specified.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit stipulations and casing/cementing program details.
The 'wet shoe' design is a specific completion technique that dictates the cementing program and creates a need for specialized pressure testing and frac initiation services. It's a non-standard condition tied to regulatory approval.
2026-10-15 Completions / Frac
Tier 3 Mandatory contact with a specific NDIC Field Inspector (Dylan Roach) required prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations, Page 2.
The stipulation names a specific inspector and their phone number, creating a procedural hurdle that must be cleared before any ground disturbance. This is a non-routine, person-specific regulatory condition.
2026-10-15 General Oilfield Services
Tier 3 Halliburton-branded cement system (SanTail WB) explicitly specified for the production liner tail cement.โฐ TIME-SENSITIVE
๐Ÿ“„ Casing & Cementing Program section for the Production Liner.
Vendor-specific product names (SanTail WB, HALAD-344, HR-601) are detailed in the approved drilling program, indicating pre-engineering and likely a pre-existing service relationship for this critical operation.
2026-10-15 General Oilfield Services
Tier 3 Well is on the 'ROSS 5 NENW' pad, which includes slots for four permitted wells (including this one) and one 'Future Well', with detailed pad construction volumes and a shared production facility layout.
๐Ÿ“„ Pad layout diagrams and notes.
The integrated pad design with a 'Future Well' slot and shared production infrastructure indicates a multi-year development plan, creating sequential opportunities for drilling, completion, and facility construction services.
2026-07-08 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Cementing & Downhole Tools
The approved drilling program specifies a Halliburton cement system and a liner hanger/pack-off assembly for a 'wet shoe' completion. This indicates imminent need for cementing services and associated tools once drilling reaches the lateral section.
Pad Construction & Earthwork
The permit includes detailed, stamped engineering plans for the ROSS 5 NENW pad with cut/fill volumes. Mandatory inspector contact is required before construction, indicating site work is a next step.
Directional Drilling & MWD
The permit approves a specific directional plan with a ~20,000 ft lateral. The program specifies survey tools ('Superior MWD+IFR1+SAG+FI') and frequent survey requirements, indicating need for directional services upon spud.
Fracturing Services
The well is permitted for completion in the Bakken pool with a ~19,500 ft lateral. The 'wet shoe' design is intended to 'frac out the shoe,' and a separate affidavit confirms hydraulic fracturing is planned, signaling a large-scale frac job after drilling and casing.