| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditioned on ability to 'frac out the shoe' of a cemented production liner with a wet shoe. ๐ Permit Stipulations The stipulation explicitly ties regulatory approval to a specific liner cementing and completion method, deviating from a standard cemented liner. |
2026-10-15 | Completions / Frac |
| Tier 3 |
Operator must contact NDIC Field Inspector Dylan Roach prior to location construction.โฐ TIME-SENSITIVE ๐ Permit Conditions The condition mandates direct contact with a named inspector, creating a specific procedural step before pad construction can begin. |
2026-10-15 | General Oilfield Services |
| Tier 3 |
Pad construction involves 39,500 C.Y. of excavation and 65,335 C.Y. of embankment for the ROSS 5 NENW/CTB/NWNW complex.โฐ TIME-SENSITIVE ๐ Engineering Plat Notes The volume of cut/fill is explicitly quantified in the civil engineering plans, indicating a major site preparation effort is either planned or underway. |
2026-07-07 | General Oilfield Services |
| Tier 3 |
Drilling plan notes '102 Proposed Stages' for the lateral. ๐ Casing & Cementing Program Notes The stage count is explicitly proposed in the engineering design, indicating a high-intensity completion design. |
Unknown | Completions / Frac |