๐Ÿ›ข๏ธ Ross 116-0515H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #43414 ยท Generated 2026-10-16 07:01

API
3306105727
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Approval conditional on a 'wet shoe' production liner design, explicitly intended to 'frac out the shoe'.
๐Ÿ“„ Permit Stipulations and Casing/Cementing Program details
A 'wet shoe' liner (cemented but with a burstable plug at TD) is a specific engineering choice for toe-initiation fracturing, deviating from a standard cemented and drilled-out shoe.
2026-10-15 Completions / Frac
Tier 3 Operator must contact NDIC Field Inspector Dylan Roach prior to location construction, creating a mandatory pre-spud regulatory touchpoint.
๐Ÿ“„ Permit Stipulations - Construction Commencement Notification
A named inspector with a direct phone number is specified for pre-construction contact, which is more specific than generic office notification.
2026-10-15 Drilling Rigs
Tier 3 Well is part of the 'ROSS 5 NENW' pad development involving major cut/fill (66,335 C.Y. total cut), access road construction, and integrated production facility planning.
๐Ÿ“„ Integrated pad layout diagrams and construction data sheets
The permit includes extensive, detailed civil engineering plans for pad construction, excavation, and interim reclamation, indicating a large-scale surface disturbance project tied to multiple wells.
2026-07-08 General Oilfield Services
Tier 3 Drilling plan notes '100 Proposed Stages' for the completion.
๐Ÿ“„ Casing & Cementing Program notes for Production Liner
Explicitly stating a proposed stage count (100) in the drilling plan indicates advanced completion design planning and scale.
Relative Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD Services
The approved directional plan specifies survey tool 'Superior MWD+IFR1+SAG+FI' and details a long lateral (19,880 ft) with precise azimuth control (126ยฐ). Drilling is anticipated to start 'Upon Approval' with a 60-90 day duration.
Cementing Services
The detailed cementing program specifies Halliburton products (SBM CEM VARICEM, NEOCEM E+, EXTENDACEM, SHALECEM) and volumes for surface, intermediate, and production liner strings, including a specialized 'wet shoe' tail cement design for the liner.
Civil Construction & Earthwork
The integrated pad layout shows major excavation (66,335 C.Y. total cut), embankment, and road construction for the Ross 5 NENW/CTB pad complex, with work likely preceding spud.
Hydraulic Fracturing & Completion Services
The permit approves 'ability to frac out the shoe' and the drilling plan notes '100 Proposed Stages'. The affidavit confirms hydraulic fracturing will be used, creating a large-scale completion opportunity following drilling.