| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Operator submitted a 'Backbuild Order Waiver' letter for the pad, stating wells will enter the Bakken outside the target spacing unit and that no notification to adjacent operator is needed as there is none. ๐ Letter from Phoenix Operating dated April 7th, 2026 Highlights a non-standard trajectory (backbuild) and proactive regulatory engagement for a multi-well pad. |
2026-04-07 | Directional Drilling |
| Tier 2 |
Permit includes a 150' north/south setback condition based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe. ๐ Permit Information / Stipulations Specific engineering condition tied to spacing approval, indicating a tailored completion design and potential operational complexity. |
Unknown | Completions / Frac |
| Tier 3 |
Permit approval email from NDIC engineer flags spacing unit may be subject to a Federal permit, instructing operator to contact BLM.โฐ TIME-SENSITIVE ๐ Email from Nathaniel Erbele dated 10/19/2026 Reveals a potential federal overlay or permitting step not fully resolved at state approval, adding regulatory risk and timing uncertainty. |
2026-10-19 | General Oilfield Services |
| Tier 3 |
Operator must drill this well in conjunction with a well that meets a 1220' setback from the east and west spacing unit boundaries to justify the spacing unit. ๐ Page 2 of 10 Creates a drilling dependency, linking the timing and success of this well to another, unspecified well. |
Relative | General Oilfield Services |