| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit includes a specific, conditional setback approval based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe. ๐ Page 1, Stipulations The approval is contingent on a specific completion design (cemented liner with wet shoe), indicating a non-standard regulatory condition tied to the well's engineering. |
Unknown | Completions / Frac |
| Tier 3 |
NDIC engineer flags that the permit is within a spacing unit that may be subject to a Federal permit, directing operator to contact BLM.โฐ TIME-SENSITIVE ๐ Email from Nathaniel Erbele, October 19, 2026 Reveals a potential overlapping federal jurisdiction that was not fully resolved at permit approval, adding a post-approval compliance step. |
2026-10-19 | General Oilfield Services |
| Tier 3 |
Operator filed a Backbuild Order Waiver request stating the wells will enter the Bakken outside the target spacing unit, with no current operator in the adjacent unit. ๐ Letter from Phoenix Operating, April 7th, 2026 Shows proactive regulatory engagement for a pad-level deviation from standard spacing unit entry, reducing notification burdens. |
2026-04-07 | Regulatory / Permitting |
| Tier 3 |
Operator must contact NDIC Field Inspector Nicole Ewoniuk prior to location construction.โฐ TIME-SENSITIVE ๐ Page 1, Stipulations A pre-construction contact requirement with a named inspector adds a procedural step and potential timing gate. |
Relative | General Oilfield Services |