๐Ÿ›ข๏ธ BULLDOG FED 35-26-23 3HF

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43423 ยท Generated 2026-10-20 05:53

API
3305310909
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Wellbore enters the Bakken Petroleum System outside the target spacing unit, requiring a Backbuild Order Waiver and notification to adjacent unit operator.
๐Ÿ“„ Letter from Phoenix Operating dated April 7th, 2026
Reveals a non-standard trajectory crossing into an adjacent unit, requiring regulatory coordination and a waiver, indicating complex pad planning.
2026-04-07 Directional Drilling
Tier 2 Permit includes a specific setback variance: 150' from north & south boundaries allowed due to production liner cemented in lateral with wet shoe and ability to frac out the shoe.
๐Ÿ“„ Permit Stipulations
Non-standard setback approval indicates a tailored wellbore construction plan to access target, revealing operational flexibility and specific engineering intent.
Unknown Completions / Frac
Tier 3 NDIC engineer flags that the spacing unit may be subject to a Federal permit and directs operator to contact BLM Dickinson.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele dated 10/19/2026
Federal mineral involvement adds a layer of regulatory review beyond state oversight, potentially affecting timing.
2026-10-19 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector Nicole Ewoniuk prior to location construction.
๐Ÿ“„ Permit Stipulations
Pre-construction contact with a named inspector is a specific, non-routine regulatory condition adding a step before pad work.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & MWD
Complex trajectory crossing unit boundaries requires precise execution per the Taktikal design; survey frequency is stipulated.
Liner Cementing & Stimulation Tools
The approved well design relies on a cemented production liner with a wet shoe system and ability to 'frac out the toe,' creating a specific tool and service need.
Waste Hauling & Disposal
Closed-loop system with cuttings hauled to Select Water Solutions landfill is a defined part of the drilling plan, indicating imminent need upon spud.
Civil Construction & Inspection Coordination
Pad construction cannot start until operator contacts named NDIC inspector Nicole Ewoniuk, creating a coordination point for earthwork contractors.