| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wellbore enters the Bakken Petroleum System outside the target spacing unit, requiring a Backbuild Order Waiver and notification to adjacent unit operator. ๐ Letter from Phoenix Operating dated April 7th, 2026 Reveals a non-standard trajectory crossing into an adjacent unit, requiring regulatory coordination and a waiver, indicating complex pad planning. |
2026-04-07 | Directional Drilling |
| Tier 2 |
Permit includes a specific setback variance: 150' from north & south boundaries allowed due to production liner cemented in lateral with wet shoe and ability to frac out the shoe. ๐ Permit Stipulations Non-standard setback approval indicates a tailored wellbore construction plan to access target, revealing operational flexibility and specific engineering intent. |
Unknown | Completions / Frac |
| Tier 3 |
NDIC engineer flags that the spacing unit may be subject to a Federal permit and directs operator to contact BLM Dickinson.โฐ TIME-SENSITIVE ๐ Email from Nathaniel Erbele dated 10/19/2026 Federal mineral involvement adds a layer of regulatory review beyond state oversight, potentially affecting timing. |
2026-10-19 | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Nicole Ewoniuk prior to location construction. ๐ Permit Stipulations Pre-construction contact with a named inspector is a specific, non-routine regulatory condition adding a step before pad work. |
Relative | General Oilfield Services |