๐Ÿ›ข๏ธ BULLDOG FED 35-26-23 4HF

Phoenix Operating LLC ยท McKenzie County, ND ยท File #43424 ยท Generated 2026-10-20 05:54

API
3305310910
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Operator submitted a 'Backbuild Order Waiver' letter stating the wells will enter the Bakken system outside the target spacing unit, with no adjacent operator to notify.
๐Ÿ“„ Letter from Meaghan Coughlan dated April 7th, 2026
Demonstrates proactive regulatory engagement for a non-standard well trajectory crossing unit boundaries.
2026-04-07 Directional Drilling
Tier 2 Permit approval includes a 150' north/south setback based on a cemented production liner with a wet shoe, allowing frac-out, deviating from standard 500' setbacks.
๐Ÿ“„ Permit Information / Stipulations
Regulatory variance for wellbore placement based on engineered completion design, indicating a tailored approach to spacing unit constraints.
Unknown Directional Drilling
Tier 3 Permit includes a directive to contact BLM Dickinson office regarding federal permit documentation for the spacing unit.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Nathaniel Erbele dated 10/19/2026
Highlights unresolved federal surface/mineral coordination, adding a regulatory pre-spud condition.
2026-10-19 General Oilfield Services
Tier 3 Operator must drill this well in conjunction with another well meeting a 1220' setback from east/west boundaries to justify the 1920-acre spacing unit.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 10
Imposes a drilling sequence dependency, linking the spud timing of this well to another well's placement.
Relative Drilling Rigs

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD
The approved well plan involves a complex trajectory entering the target zone outside the spacing unit, requiring precise execution of the Taktikal Directional design. Drilling cannot commence until the companion well with 1220' setback is drilled.
Site Construction & Civil Earthwork
The pad layout shows significant cut/fill earthwork (~46,240 cu yds) and access road construction. Work must start only after NDIC inspector notification, creating a near-term mobilization signal.
Waste Hauling & Disposal
A closed-loop system is mandated with cuttings hauled to the pre-selected Select Water Solutions landfill. This requirement is active from spud through drilling.
Regulatory & Land Coordination
Urgent need to contact BLM Dickinson office to resolve federal permit status before any construction, as flagged by the NDIC engineer.