| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Permit includes a strict deadline: well must be completed as a Saltwater Disposal well by October 20, 2027, or the permit expires.โฐ TIME-SENSITIVE ๐ Page 3 of 10, UIC stipulations Imposes a firm, non-extendable completion deadline, creating urgency for drilling, completion, and facility construction services. |
2027-10-20 | General Oilfield Services |
| Tier 3 |
Detailed as-built schematic of the entire SWD facility must be submitted within 30 days of construction completion. ๐ Page 2 of 10, Stipulations Imposes a detailed post-construction documentation and submission requirement, not typical for all wells. |
Relative | General Oilfield Services |
| Tier 3 |
On-site inspection with NDIC Field Inspector William Ryan required prior to location construction. ๐ Page 1 of 10, Stipulations Adds a regulatory pre-construction gate that can delay pad building and requires coordination with a specific inspector. |
Relative | General Oilfield Services |
| Tier 3 |
Tank diking variance approved contingent on submission of an as-built site schematic after construction. ๐ Page 3 of 10, Stipulations A regulatory variance is granted but conditional on final documentation, adding a compliance step post-construction. |
Relative | General Oilfield Services |
| Tier 3 |
Step-rate test required with injection pressure not to exceed permitted MAIP; results must be reported on a Sundry Form. ๐ Page 2 of 10, Stipulations Mandates a specific, non-routine well test post-completion, requiring specialized pumping and pressure monitoring services. |
Relative | General Oilfield Services |