๐Ÿ›ข๏ธ Liberty State 12-36H SWD

True Oil LLC ยท McKenzie County, ND ยท File #43430 ยท Generated 2026-10-22 02:39

API
3305310912
Target Formation
Dakota
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Permit includes a strict deadline: well must be completed as a Saltwater Disposal well by October 20, 2027, or the permit expires.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 3 of 10, UIC stipulations
Imposes a firm, non-extendable completion deadline, creating urgency for drilling, completion, and facility construction services.
2027-10-20 General Oilfield Services
Tier 3 Detailed as-built schematic of the entire SWD facility must be submitted within 30 days of construction completion.
๐Ÿ“„ Page 2 of 10, Stipulations
Imposes a detailed post-construction documentation and submission requirement, not typical for all wells.
Relative General Oilfield Services
Tier 3 On-site inspection with NDIC Field Inspector William Ryan required prior to location construction.
๐Ÿ“„ Page 1 of 10, Stipulations
Adds a regulatory pre-construction gate that can delay pad building and requires coordination with a specific inspector.
Relative General Oilfield Services
Tier 3 Tank diking variance approved contingent on submission of an as-built site schematic after construction.
๐Ÿ“„ Page 3 of 10, Stipulations
A regulatory variance is granted but conditional on final documentation, adding a compliance step post-construction.
Relative General Oilfield Services
Tier 3 Step-rate test required with injection pressure not to exceed permitted MAIP; results must be reported on a Sundry Form.
๐Ÿ“„ Page 2 of 10, Stipulations
Mandates a specific, non-routine well test post-completion, requiring specialized pumping and pressure monitoring services.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
Permit requires a perimeter berm, graded pad, and construction of a large containment facility; work must commence after the mandatory pre-construction inspection and be completed before the permit expiry in 2027.
Well Testing & Pumping Services
A step-rate test is required before routine injection can begin, and a pressure test on the injection pipeline to 100 psi over MAIP is mandated, creating discrete service events post-completion.
Cementing & Downhole Services
Detailed cementing program specified for both surface and injection casing with specific slurry designs and excess volumes, indicating precise service requirements during drilling.
Environmental & Regulatory Compliance
Multiple stipulations require Sundry Notices, as-built schematics, and test result reporting within defined timelines, necessitating dedicated regulatory coordination and documentation services.