๐Ÿ›ข๏ธ GARFIELD FEDERAL 5003 43-15 4B

WHITING OIL AND GAS CORPORATION ยท McKenzie County, ND ยท File #43432 ยท Generated 2026-10-23 02:52

API
3305310913
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Approval condition includes a 150' north/south setback based on a production liner cemented in the lateral with a wet shoe and ability to frac out the shoe.
๐Ÿ“„ Permit Information / STIPULATIONS
Specific geomechanical completion constraint tied to liner cementing and shoe fracking, indicating a tailored wellbore isolation and completion design.
Unknown Completions / Frac
Tier 3 Permit applications flagged by NDIC as within a spacing unit that may be subject to a Federal permit; operator directed to contact BLM Dickinson.โฐ TIME-SENSITIVE
๐Ÿ“„ Email from Emma Neigum dated Thursday, October 22, 2026 11:09:55 AM
Additional federal layer (BLM) may be involved, adding complexity and potential delay.
2026-10-22 General Oilfield Services
Tier 3 Waiver requested for adjacent operator notification per Order No. 31848 because Whiting is the operator of the adjacent spacing unit.
๐Ÿ“„ Email from Melissa Szudera dated Tuesday, October 6, 2026
Operator leverages its own adjacent unit ownership to streamline regulatory drill-back notification.
2026-10-06 Regulatory / Permitting
Tier 3 Anticipated commencement date is June 07, 2025, with approximately 30 drilling days.โฐ TIME-SENSITIVE
๐Ÿ“„ Section 1.8 Anticipated Starting Dates
Firm planned spud date provided in operator's submission, which is unusually specific for a permit file.
2025-06-07 General Oilfield Services
Tier 3 Operator must contact NDIC Field Inspector William Ryan prior to location construction; perimeter berm required.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Information / Conditions of Approval
Pre-construction inspector contact and specific berm requirement add regulatory steps before pad build.
Relative General Oilfield Services
Tier 3 Closed mud system with no cuttings pit required; remote/automatic shutoff devices required on all equipment.
๐Ÿ“„ Permit Information / Permit Review Policy
Non-standard environmental and safety controls mandated beyond basic regulations.
Unknown Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Completions
Anticipated spud date of June 2025 with 30-day drilling window; wet shoe and liner cementing require specialized pressure control and cementing services.
Environmental & Waste Management
Closed mud system, no cuttings pit, and listed licensed disposal facilities (e.g., Ideal Oilfield Disposal, Secure Energy Services) indicate need for cuttings hauling and disposal contracts.
Surveying & Pad Construction
Pre-construction inspector notification required; perimeter berm and pad construction must precede spud. Surveyor 4DIMENSION already engaged.
Regulatory & Permitting
BLM federal permit may be required; coordination needed with BLM Dickinson. Adjacent operator waiver reduces delay but federal step adds potential timeline risk.