| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval condition includes a 150' north/south setback based on a production liner cemented in the lateral with a 'wet shoe' to allow frac out. ๐ NDIC Field Order Info Specific wellbore construction (wet shoe) is directly tied to a regulatory setback condition, indicating a non-standard completion design is mandated. |
Unknown | Completions / Frac |
| Tier 3 |
Anticipated commencement date is June 7, 2025, with ~30 days drilling and ~30 days completion.โฐ TIME-SENSITIVE ๐ Anticipated Starting Dates Explicit, forward-looking schedule provided in the permit package, indicating planned timing over a year in advance. |
2025-06-07 | General Oilfield Services |
| Tier 3 |
Operator asserts it will use an indirect heater with an NDIC setback exemption (Case 28949 Order 31500), allowing placement within 60' of wellhead. ๐ FACILITY STATEMENT Reveals pre-approved, non-standard facility layout relying on a specific regulatory exemption. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator must not commence operations until the 3rd business day after permit publication, unless waived by the Director.โฐ TIME-SENSITIVE ๐ Conditions of Approval Imposes a mandatory waiting period between permit approval and spud, affecting rig scheduling and start timing. |
Relative | Drilling Rigs |
| Tier 3 |
Permit approval conditional on drilling a back-to-back well to justify spacing unit, with a specific 1220' setback requirement. ๐ STIPULATIONS section, SPECIAL ATTENTION Creates a linked, sequential drilling obligation for this well, forcing a specific operational sequence and timing. |
Unknown | General Oilfield Services |