| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit includes a 'wet shoe' cementing configuration for the production liner, with a specific setback justification based on this design. ๐ Stipulations section, page 1 The 'wet shoe' is a non-standard cementing technique that influences regulatory setbacks and completion design, indicating a specific operational plan. |
Unknown | Completions / Frac |
| Tier 3 |
Operator requested a waiver from the drill-back notification requirement to adjacent operators, citing that Whiting is the operator of the adjacent unit.โฐ TIME-SENSITIVE ๐ Letter dated Tuesday, October 6, 2026 Explicitly seeks to bypass a standard regulatory notification step, indicating consolidated operator control over the area and streamlined internal planning. |
2026-10-06 | Regulatory / Permitting |
| Tier 3 |
The approved directional plan shows a 'nudge' in the surface hole section, indicating a planned directional correction very early in the well path. ๐ Trajectory/Wall Plot diagram, page 2 of attached 'Proposed Work' document A surface hole 'nudge' is a specific directional design choice to achieve trajectory objectives, requiring precise steering from the start. |
Unknown | Directional Drilling |
| Tier 3 |
Permit stipulates that Whiting must contact NDIC Field Inspector William Ryan prior to location construction. ๐ Stipulations section, page 1 A pre-construction contact requirement with a named inspector is a specific, non-routine condition of approval. |
Unknown | General Oilfield Services |