๐Ÿ›ข๏ธ GARFIELD FEDERAL 5003 43-15 6B

WHITING OIL AND GAS CORPORATION ยท McKenzie County, ND ยท File #43435 ยท Generated 2026-10-26 02:45

API
3305310916
Target Formation
BAKKEN
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Approval condition includes a 150' north/south and 500' east/west setback from boundaries within a 1920-acre unit, with north setback based on a production liner cemented in lateral with a wet shoe.
๐Ÿ“„ NDIC Field Order Info
Specific, non-standard setback justifications tied to a wet shoe completion design, indicating a tailored wellbore construction and completion approach.
Unknown Completions / Frac
Tier 3 Anticipated drilling commencement date is June 07, 2025, with approximately 30 drilling days.โฐ TIME-SENSITIVE
๐Ÿ“„ 1.8 Anticipated Starting Dates
Provides a specific planned spud date and duration, which is a forward-looking schedule not common in permits.
2025-06-07 Drilling Rigs
Tier 3 Permit includes a waiver request for porosity and resistivity logs; only a Cement Bond Log is planned from intermediate casing to surface shoe.
๐Ÿ“„ GEOLOGIC INFORMATION, PROPOSED LOGS; 1.7 Evaluation Program
Non-standard evaluation program with waived open-hole logs, reducing downhole logging scope but mandating a specific cased-hole log.
Unknown Regulatory / Permitting
Tier 3 Drill-back stipulation requiring this well to be drilled back-to-back with another well (GARFIELD FEDERAL 5003 43-15 3B) to justify the spacing unit.
๐Ÿ“„ PERMIT INFORMATION, STIPULATIONS
Creates a direct, sequential operational dependency between two specific wells, forcing a specific drilling sequence and timeline.
Unknown Drilling Rigs
Tier 3 Operator must contact NDIC Field Inspector William Ryan prior to location construction.
๐Ÿ“„ Conditions of Approval
Pre-construction regulatory contact is a specific, mandated step, creating a gate before any pad work can begin.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Completions
Drill-back stipulation creates an immediate, sequential opportunity for the paired well (43-15 3B). Anticipated spud date of June 2025 sets a medium-term timeline.
Civil Construction & Surveying
Mandatory contact with inspector Ryan is a pre-construction gate. Surveyor 4DIMENSION is already engaged, but pad construction and road work are pending.
Waste & Environmental Services
Operator has pre-identified a list of licensed disposal facilities for cuttings, indicating imminent need for hauling and disposal services upon spud.
Cementing & Downhole Tools
Wet shoe design and specific cementing requirements for the production liner create a need for specialized cementing services and liner equipment.