| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit approval conditional on 150' north/south and 500' east/west setbacks within the 2400-acre unit, based on a 'wet shoe' liner cementing design. ๐ Page 2, NDIC Field Order Info Approval is explicitly tied to a specific, non-standard completion technique (wet shoe), indicating regulatory acceptance of a design that influences cementing, perforating, and stimulation services. |
2026-10-27 | Completions / Frac |
| Tier 3 |
Drill-back affidavit filed notifying Devon Energy of wellbores traversing adjacent spacing unit, with drilling anticipated to commence.โฐ TIME-SENSITIVE ๐ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION Demonstrates active, pre-drilling coordination with a major competitor (Devon) and confirms intent to drill imminently, signaling near-term activity. |
2026-10-14 | General Oilfield Services |
| Tier 3 |
Permit instructs operator to contact NDIC Field Inspector Jessica Gilkey prior to location construction.โฐ TIME-SENSITIVE ๐ Page 2, Construction Commencement Notification Adds a mandatory regulatory checkpoint before pad construction can begin, affecting earthwork and construction scheduling. |
Relative | General Oilfield Services |
| Tier 3 |
Mandated 21-31 day advance written notice to adjacent operators (Devon Energy, Prima Exp.) for hydraulic fracture stimulation due to proximity.โฐ TIME-SENSITIVE ๐ Page 1, SPECIAL ATTENTION stipulation Creates a formal, time-bound coordination requirement with competitors, revealing operational constraints and potential for shared services or scheduling conflicts. |
Relative | Completions / Frac |