๐Ÿ›ข๏ธ Iverson Federal 5404 11-35 2B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #43437 ยท Generated 2026-10-28 02:39

API
3310506923
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Permit approval conditional on 150' north/south and 500' east/west setbacks within the 2400-acre unit, based on a 'wet shoe' liner cementing design.
๐Ÿ“„ Page 2, NDIC Field Order Info
Approval is explicitly tied to a specific, non-standard completion technique (wet shoe), indicating regulatory acceptance of a design that influences cementing, perforating, and stimulation services.
2026-10-27 Completions / Frac
Tier 3 Drill-back affidavit filed notifying Devon Energy of wellbores traversing adjacent spacing unit, with drilling anticipated to commence.โฐ TIME-SENSITIVE
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION
Demonstrates active, pre-drilling coordination with a major competitor (Devon) and confirms intent to drill imminently, signaling near-term activity.
2026-10-14 General Oilfield Services
Tier 3 Permit instructs operator to contact NDIC Field Inspector Jessica Gilkey prior to location construction.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 2, Construction Commencement Notification
Adds a mandatory regulatory checkpoint before pad construction can begin, affecting earthwork and construction scheduling.
Relative General Oilfield Services
Tier 3 Mandated 21-31 day advance written notice to adjacent operators (Devon Energy, Prima Exp.) for hydraulic fracture stimulation due to proximity.โฐ TIME-SENSITIVE
๐Ÿ“„ Page 1, SPECIAL ATTENTION stipulation
Creates a formal, time-bound coordination requirement with competitors, revealing operational constraints and potential for shared services or scheduling conflicts.
Relative Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Directional Services
Drill-back notification filed and permit approved; drilling is anticipated to commence imminently, creating immediate demand.
Cementing & Completion Services
Permit conditioned on 'wet shoe' cementing design for the production liner, locking in specific cementing and completion techniques for the lateral.
Hydraulic Fracturing & Stimulation
Mandatory 21-31 day advance notice to adjacent operators creates a defined planning window; operator asserts no diesel-based fluids will be used.
Surveying & Well Planning
Vendor 4DIMENSION explicitly named on plat; detailed anti-collision procedures and well paths indicate ongoing planning needs.
Waste/Cuttings Disposal
Operator lists seven specific licensed disposal facilities, indicating a selection will be made for dry cuttings hauling from this well.