| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval conditioned on specific lateral setback using a production liner cemented with a wet shoe and ability to frac out the shoe. ๐ PERMIT INFORMATION / STIPULATIONS Specifies a non-standard completion contingency (wet shoe) and a required frac-out capability as a condition of permit approval. |
Unknown | Completions / Frac |
| Tier 3 |
Letter states Devon is operator of adjacent spacing unit, waiving requirement to notify others for wells entering Bakken outside target unit. ๐ September 2nd, 2026 Letter Reveals operator's multi-well pad strategy with laterals crossing into adjacent units they also control, simplifying regulatory process. |
2026-09-02 | General Oilfield Services |
| Tier 3 |
Operator must contact NDIC Field Inspector Jessica Gilkey prior to location construction.โฐ TIME-SENSITIVE ๐ PERMIT INFORMATION / STIPULATIONS Identifies a specific, named field inspector as the mandatory pre-construction contact, indicating heightened regulatory oversight for this pad. |
Relative | General Oilfield Services |
| Tier 3 |
Drill cuttings to be hauled to a licensed disposal facility, WISCO Oilfield Special Waste Landfill. ๐ PROPOSED DRILLING PLAN / DISPOSAL OF DRILL CUTTINGS Explicitly names the waste disposal vendor and facility, locking in a service contract for cuttings hauling and disposal. |
Unknown | General Oilfield Services |
| Tier 3 |
Operator asserts it will not use diesel-based compounds in hydraulic stimulation, listing specific CAS numbers. ๐ PROPOSED DRILLING PLAN / STIMULATION Goes beyond standard compliance by explicitly listing prohibited CAS numbers, indicating a formal, auditable non-diesel frac fluid program. |
Unknown | Completions / Frac |